IMS Logo

IMS Simple Sequencing Best Practice and Implementation Guide

Version 1.0 Final Specification

Copyright © 2003 IMS Global Learning Consortium, Inc. All Rights Reserved.
The IMS Logo is a trademark of IMS Global Learning Consortium, Inc.
Document Name: IMS Simple Sequencing Best Practice and Implementation Guide
Revision: 03 March 2003 

IPR and Distribution Notices

Recipients of this document are requested to submit, with their comments, notification of any relevant patent claims or other intellectual property rights of which they may be aware that might be infringed by any implementation of the specification set forth in this document, and to provide supporting documentation.

IMS takes no position regarding the validity or scope of any intellectual property or other rights that might be claimed to pertain to the implementation or use of the technology described in this document or the extent to which any license under such rights might or might not be available; neither does it represent that it has made any effort to identify any such rights. Information on IMS's procedures with respect to rights in IMS specifications can be found at the IMS Intellectual Property Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

Copyright © IMS Global Learning Consortium 2006. All Rights Reserved.

If you wish to distribute this document or use this document to implement a product or service, you must complete a valid license registration with IMS and receive an email from IMS granting the license. To register, follow the instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm.

This document may be copied and furnished to others by Licensee organizations registered on the IMS website provided that the above copyright notice and this paragraph are included on all such copies. However, this document itself may not be modified in any way, such as by removing the copyright notice or references to IMS, except as needed for the purpose of developing IMS specifications, under the auspices of a chartered IMS work group.

Use of this specification to develop products or services is governed by the license with IMS found on the IMS website:  http://www.imsglobal.org/simplesequencing/ssv1p0/ssv1p0seclicense.html.

The limited permissions granted above are perpetual and will not be revoked by IMS or its successors or assigns.

THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTER'S OWN RISK, AND NEITHER THE CONSORTIUM, NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.


Table of Contents


1. Introduction
     1.1 Overview
     1.2 Scope and Context
     1.3 Structure of this Document
     1.4 Nomenclature
     1.5 References

2. Relationship to Other Specifications
     2.1 IMS Specifications
           2.1.1 IMS Content Packaging
           2.1.2 IMS Question and Test Interoperability
           2.1.3 IMS Reusable Definition of Competency or Educational Objectives
           2.1.4 IMS Learning Design
     2.2 Related Specifications
           2.2.1 ADL SCORM
     2.3 IMS Specification Development Process

3. Overview of the Simple Sequencing Model
     3.1 Conceptual Model
           3.1.1 Scope
           3.1.2 Learning Activity
           3.1.3 Activity Tree
           3.1.4 Activity Resources
           3.1.5 Activity Clusters
           3.1.6 Navigation Control Modes
           3.1.7 Rule-Based Sequencing - Conditional Rules

4. Basic Examples
     4.1 Example of Sequencing Element
     4.2 Example of Sequencing Rules
     4.3 Example of Rollup Rules
     4.4 Example of Limit Conditions
     4.5 Example of Learning Objectives
     4.6 Example of Auxiliary Resources

5. Advanced Examples
     5.1 Photoshop - Remediation
     5.2 Photoshop - Data Mapping

6. Interaction with Content Packaging
     6.1 Content Aggregation
     6.2 Activity Tree
     6.3 Example of Embedded Sequencing Information

7. Runtime Implementation
     7.1 The Sequencing Loop
           7.1.1 Navigation Behavior
           7.1.2 Exit Behavior
           7.1.3 Rollup Rules
           7.1.4 Sequencing Behavior
           7.1.5 Delivery Behavior

8. Best Practice Recommendations
     8.1 Status Information Model
     8.2 Behavior Model
     8.3 Data Types, Multiplicities, and Obligations
     8.4 Binding of Simple Sequencing Information
     8.5 Data Collection and Updating Best Practices
           8.5.1 Data Updates
     8.6 Rule Evaluation Best Practices
           8.6.1 Order of Evaluation
           8.6.2 Optimizations
     8.7 Activity Tree Traversal
     8.8 Handling of Tracking Data Best Practices
     8.9 Numeric Tracking Data Best Practices

Appendix A - Glossary of Elements and Attributes

Appendix B - List of Example Files

Appendix C - SCORM Application Profiling of Simple Sequencing

About this Document
     List of Contributors

Revision History

Index

1. Introduction

1.1 Overview

The IMS Simple Sequencing Specification provides a means to represent information needed to sequence learning activities in a variety of ways. This Best Practice and Implementation Guide provides examples, clarifying explanations, implementation suggestions, and other information which may be used to develop systems which deliver sequenced content based on the Simple Sequencing Information Model [SS 03a]. Since this is the first version of this document, the practices included here represent early experience and will likely improve with future versions.

This is the first version of this specification and there is no previous history of this document, other than the drafts which preceded it. The IMS Simple Sequencing Specification stands on its own and may be used to describe sequencing information which is embedded in an IMS Content Packaging manifest. Alternatively, this information may be included in its own file.

1.2 Scope and Context

This document is the first version of the IMS Simple Sequencing Best Practice and Implementation Guide. As such it should be used in conjunction with:

1.3 Structure of this Document

The structure of this document is:

2. Relationship to Other Specifications

The relationship of this specification to other IMS and external specification activities.

3. Overview of the SS Model
A brief summary of the IMS SS behavior and information models.
4. Basic Examples

Basic examples of SS enabled content.

5. Advanced Examples

Advanced examples of SS enabled content.

6. Interaction with Content Packaging
Implementation guidance and tips for SS in the context of an IMS Content Package.
7. Runtime Implementation

Implementation guidance and tips for run time system developers.

8. Best Practice Recommendations

Implementation guidance and tips for content developers.

Appendix A
Glossary of Elements and Attributes.
Appendix B
List of Example Files.
Appendix C
SCORM Application Profiling of Simple Sequencing.

1.4 Nomenclature

The following abbreviations and acronyms are used in this document:

ADL
Advanced Distributed Learning
AICC
Aviation Industry CBT Committee
ANSI
American National Standards Institute
API
Application Programming Interface
CBT
Computer Based Training
CMI
Computer Managed Instruction
CPI
Content Packaging Interchange
DTD
Document Type Definition
IEEE
Institute of Electronic & Electrical Engineering
ISO
International Standards Organization
JTC
Joint Technical Committee
LTS
Learning Technology System
LTSC
Learning Technology Standards Committee
SCORM
Shareable Courseware Object Reference Model
SS
Simple Sequencing
W3C
World Wide Web Consortium
XML
Extensible Mark-up Language

1.5 References

The following document references are identified:

[SS, 03a,b]

IMS Simple Sequencing Specification Information Model, Binding Guide v1.0, March 2003

[CP, 01a,b,c]

IMS Content Packaging Specification - Information Model, Binding, Best Practices v1.1.2, August 2001

[QTI, 02a,b,c]

IMS Question and Test Interoperability Specification - Information Model, Binding, Best Practices v1.2, February 2002

[RDCEO, 02a,b,c]

IMS Reusable Definition of Competency or Educational Objective Specification - Information Model, Binding, Best Practices v1.0, October 2002

[LD, 03a,b,c]

IMS Learning Design Specification - Information Model, Binding, Best Practices v1.0, January 2003

[RFC 1766]

http://ds.internic.net/rfc/rfc1766.txt (xml:lang)

[SCORM]
http://www.adlnet.org (ADL SCORM)

2. Relationship to Other Specifications

2.1 IMS Specifications

Version 1.0 of the IMS Simple Sequencing Specification is made up of three documents:

The IMS Simple Sequencing Specification is related to other IMS specifications, both complete and in-progress. This specification is intended to be consistent with these other initiatives wherever possible, in order to reduce redundancy and confusion between specifications. The related specifications are:

2.1.1 IMS Content Packaging

The IMS Simple Sequencing binding defines a unique namespace for sequencing elements in such a way as to permit these elements to be embedded within an IMS Content Packaging manifest file. Elements in the Simple Sequencing namespace can be considered as extending the functionality of Content Packaging to included additional sequencing information. Simple Sequencing elements are intended to be included in the <organization> element of Content Packaging, which contains items that may be recursively included to create hierarchical trees of items. This tree corresponds to the activity tree that drives sequencing.

2.1.2 IMS Question and Test Interoperability

Several potential areas of harmonization with QTI have been identified during the development of Simple Sequencing. These include:

Simple Sequencing defines randomization of activities in a manner similar to that of QTI. Both the selection of activities from a set and/or random ordering of activities are supported. Simple sequencing does not support the filtering capability defined in QTI 1.2.

Learning activities are defined by resources associated with the leaf nodes of the Simple Sequencing activity tree or by aggregations of these nodes. Simple Sequencing does not place any restrictions on what can be sequenced in such a tree. An assessment defined by QTI could be one such activity. It is up to the learning management system (LMS) to detect assessments defined by QTI and deliver them in an appropriate manner.

QTI defines a means to associate competency, skill, mastery, or learning objectives with a question or set of questions. Simple Sequencing, in turn, defines an objective identifier and associated rules for testing mastery. More work is needed to determine how information flows between QTI and sequencing, but the mastery objective reference ID number should provide the basic link to make this happen.

2.1.3 IMS Reusable Definition of Competency or Educational Objectives

The IMS RDCEO Specification defines a means to create and identify competency (skill, mastery, objective, etc.) objects. Among the required pieces of information for an RDCEO object definition is an identifier string which could serve as an objective reference ID number.

2.1.4 IMS Learning Design

The IMS Learning Design Specification defines a learning activity and the various roles people take on in the learning process. It includes three levels which define resources, added conditions and properties, and finally, notification. It is intended to support a diverse set of learning styles and approaches.

The conditions and properties capability supported by Level 2 Learning Design includes the ability to sequence learning activities. This can be viewed as an alternative approach to Simple Sequencing which includes provisions for learning styles not addressed by this specification. Additional work will be required to determine how these sequencing styles might interact.

2.2 Related Specifications

2.2.1 ADL SCORM

The ADL Sharable Content Object Reference Model (SCORM)] describes a Web-based learning content aggregation model and runtime environment for learning objects. The current version of the SCORM (v1.2) is based on the IMS Content Packaging Specification, IMS Meta-Data Specification, an AICC data model, and a communications interface developed in conjunction with the IEEE LTSC. Simple Sequencing was developed to enhance the sequencing capabilities in SCORM and is expected to be released as SCORM v1.3. Simple Sequencing is, however, a general purpose sequencing method and may be incorporated in other applications or environments.

2.3 IMS Specification Development Process

The development lifecycle for an IMS specification has been established as:

The term 'Base Document' is used for draft specifications that have reached a relatively high level of stability based on input from the team and the Technical Board. Base documents represent the stage in the specification process of final development and refinement. It is base documents that are presented in their final forms to the IMS Technical Board for vote. If approved, the document becomes a 'Public Draft Specification' and is listed as such on the IMS Public Website. If not approved, the team works through whatever adjustments and recommendations the Technical Board provides, and then resubmits the document. After three months the Public Draft Specification should be adopted as a 'Final Specification'.

After a Final Specification is released, the team develops the next scope document and seeks a charter for subsequent work. New requirements and features dropped from the previous specification constitute the scope of the next effort.

3. Overview of the Simple Sequencing Model

The Simple Sequencing model is intended to provide base level support for sequencing learning activities. It is purposely neutral with regard to models of pedagogy and the use of instructional strategies, but it describes only fairly simple behaviors in order to limit the specification and especially conformance verification to a manageable scope.

3.1 Conceptual Model

Sequencing occurs within a conceptual runtime environment which translates navigation events into navigation requests to the sequencing engine. Results of sequencing are then used to modify or create the user interface which the learner sees. This model is intended to give enough background to an implementer to understand how the Simple Sequencing Specification can fit into a complete delivery environment. The examples and practices given here are for illustration purposes only and represent only one way to realize the Simple Sequencing Model in an actual implementation.

3.1.1 Scope

the simple sequencing problem space

Figure 3.1 - Problem space.

The Simple Sequencing Specification addresses a small but productive segment of the entire problem space for learning content sequencing. The IMS Simple Sequencing Specification relies on the concept of learning activities. A learning activity may be loosely described as an instructional event or events embedded in a content resource, or as an aggregation of activities that eventually resolve to discreet content resources with their contained instructional events.

3.1.2 Learning Activity

A Learning Activity is a pedagogically neutral unit of instruction, knowledge, assessment, etc. It can have sub-activities and may be nested to an arbitrarily deep level. Each activity may have a tracking status associated for each learner that is assigned to experience the activity. Activities can be attempted any number of times, or the number can be specified. They can be suspended, abandoned, exited normally, etc. All activities are performed within the context of a parent activity.

3.1.3 Activity Tree

The activities managed through Simple Sequencing are arranged as an activity tree (see Figure 3.2). LMS sequencing behavior is described in terms of traversing the nodes of the tree to determine which activity to deliver to the learner. Each node in this tree is an activity.

The tree is not necessarily balanced and its branches are not necessarily of equal length. There is an implicit containment hierarchy in the tree. For example, activity AB is said to be part of activity A. Activity ABCA is part of activity ABC which is part of activity AB. You can assign any conceptual label you want to those activities. For example, one could say that A is a course, AA a lesson, and AAA a step in that lesson. Another implementer may define A as a curriculum, AA as an assigned task, and AAA as a lesson.

activity tree

Figure 3.2 - Activity tree.

The Simple Sequencing Specification defines the canonical traversal of the activity tree as pre-order traversal. Using the example in Figure 3.2, this means that, starting from A, the traversal would go to AA, then AAA, then AAB, then AAC, then AB, then ABA, etc. Note that the reverse pre-order traversal is not just a mirror image of the forward pre-order traversal. Using the example in Figure 3.2 again, the precedent of AC is ABCA, not AB.

The default traversal path can be modified through the association of sequencing rules created by a learning designer. Traversal is triggered by a sequencing request, which in turn is triggered by the learner through navigational events or by the delivery system itself. Sequencing rules are evaluated at runtime and can be conditional based on tracking status. Activities are always delivered one at a time and may have auxiliary resources associated with them.

Note: The activity tree can be represented as an <organization> element in the IMS Content Packaging Specification. The top level activity is the <organization> itself, and each node in the tree is an <item> in the <organization>. However, the Simple Sequencing Specification itself makes no assumptions about packaging of the learning content. The same Simple Sequencing behaviors and rules defined in this specification could be used for content that is assembled and managed dynamically by an intelligent tutoring system, for example.

3.1.4 Activity Resources

A content resource may be associated with any node in the activity tree that is a leaf node. What this means is that the delivery of an activity involves the delivery of the content resource. The Simple Sequencing Specification assumes that some content resources may be able to communicate results, and others not. For example, a resource may be a "dumb" document or HTML page, or it may be a SCO as defined in SCORM. Simple Sequencing assumes that some results that map to the status data model defined in the specification; however, it does not define how to communicate the data. There can be different ways to do this, all of which would work with Simple Sequencing. Therefore, how a content resource can communicate results must be defined elsewhere.

If no content resource is associated with a leaf node, Simple Sequencing does not specify any particular behavior. This is an example of an undefined behavior, which is outside the scope of the Simple Sequencing Specification.

3.1.5 Activity Clusters

Simple Sequencing rules are associated with clusters of activity nodes. In Simple Sequencing, the term cluster refers to a single node and its immediate children. The scope of a particular rule never extends beyond the cluster. For example, many rules govern how to handle the sub-activities in a cluster, or rollup the result of the sub-activities in a cluster. Those rules are associated with the parent node in the cluster. Other rules are associated with a specific activity and do not affect its children.

Examples of Clusters

Figure 3.3 - Examples of Clusters.

3.1.6 Navigation Control Modes

Unless otherwise specified, a learner is allowed to choose any sub-activity in a cluster, but a guided flow through the cluster can also be specified. Flowing through a cluster as a learner continues from activity to activity delivers each of the sub-activities in the cluster, one after the other, as shown in Figure 3.4. The rule that governs whether such guided flow is enabled is associated with the parent node in the cluster. If the sub-activities are leaf nodes with an associated content resource, the flow of sequencing will deliver each of these content resources, one after the other.

Enabling forward flow for activity AA. The learner sees AAA, AAB, then AAC

Figure 3.4 - Enabling forward flow for activity AA. The learner sees AAA, AAB, then AAC.

The basic control modes that govern this behavior are choice and flow, each of which can be enabled or disabled. If choice is disabled, the user is not allowed to choose but must follow the defined flow. If flow is enabled, the user is guided through the activities according to the structure of the tree. Both can be enabled at the same time, in which case the user can choose any activity, but can also be guided. However, both cannot be disabled at the same time.

The same control modes can be specified for all the clusters in an activity tree, or they can be different for different clusters. For example, the learner may be guided by flow through a sequence of exercises within which she is free to choose different practice items.

3.1.7 Rule-Based Sequencing - Conditional Rules

Complex navigation behaviors may be achieved by assigning rules to different nodes at different levels of nesting. Figure 3.5 shows how the traversal of the tree as the user continues from activity to activity when flow is enabled can be affected by rules. In this example, specific nodes have a rule that specifies that they should be skipped under certain conditions. Each cluster is given a rule called "control mode" that enables flowing through its children, and specific nodes are given a conditional rule that states that it should be skipped.

Example of effect of rules that affect navigation for specific activity nodes (conditional skip)

Figure 3.5 - Example of effect of rules that affect navigation for specific activity nodes (conditional skip).

Many of the conditional rules defined in Simple Sequencing are based on data collected by tracking the results of activities. When an activity contains sub-activities, in other words when it is the parent node in an activity cluster, the results of the sub-activities are rolled up into summary results for the cluster. This is not always desirable. For example, whether a learner succeeded in a free practice should not affect the result of a course. Rollups can be controlled in two ways. One way is by the assignment of rollup rules to a cluster, as shown in Figure 3.6. The other way is by "tagging" a particular sub-activity to specify it should not be included in rollups.

Example of the effect of a rule that controls rollup of sub-activity results

Figure 3.6 - Example of the effect of a rule that controls rollup of sub-activity results.

4. Basic Examples

The IMS Simple Sequencing Specification defines a set of elements that describe how activities organized in an activity tree should be presented to the user. This presentation, or sequencing is defined by normative behaviors closely associated with these elements. These behaviors must be properly implemented to ensure a consistent user experience from system to system.

Any packaged collection of learning activities may contain sequencing descriptions defined by the Simple Sequencing Specification. This description is comprised of elements defined in the Simple Sequencing Information Model that are expected to be used in a manner described by the Simple Sequencing Information and Behavior Model.

The IMS Content Packaging Specification describes one way to package collections of learning activities using a file called a manifest. Simple Sequencing elements may be included in this manifest in an <organization> element. If a <sequencing> element is present in the manifest, it indicates that a sequencing process will be required to deliver these activities in a consistent manner. Although the presences of a <sequencing> element indicates that sequencing information is present, parsing the manifest every time to determine this could be inefficient. One approach to making it easier to determine if sequencing is needed would be to add meta-data to the top level of the manifest. A vocabulary extension such as follows could be used:

<technical>
<requirement>
<type>
<source>IMS</source>
<value>IMS Sequencing 1.0</value>
<type>
</requirement>
</technical>

Note that a Content Package may have multiple <organization> sections in an <organizations>. These may contain separate or alternative sequencing descriptions. For example, one organization may contain a set of 'dumb' content to presented in the default order, while another organization may allow richer interaction by including sequencing data.

The following diagrams show the various sequencing elements and how they are assembled into groups of elements that describe how activities should be sequenced.

4.1 Example of Sequencing Element

<sequencing> element

Figure 4.1 - <sequencing> element.

Sequencing information consists of an identifier and sequencing reference, plus additional information. The control mode specifies how sequencing will proceed for this node: flow, auto advance, or choice. Sequencing rules provide details of the rules to be used for sequencing behavior. Limit conditions allow limits to be placed on the number attempts, etc. Auxiliary resources provide a means to link in other resources such as glossaries, help text, Interactive Electronic Technical Manuals (IETMs), etc. Rollup rules control how information in sub-activities are rolled up into higher level nodes in the activity tree. Objectives are a list of learning objectives associated with this node. Randomization controls define how selection and randomization of activities are to be done. Finally, the delivery controls are used when the activity is delivered.

Diagram of basic sequencing behavior

Figure 4.2 - Diagram of basic sequencing behavior.

Here is a basic example of how sequencing information can be merged into an IMS Content Package manifest:

<?xml version = "1.0" encoding = "UTF-8"?>
<manifest xmlns = "http://www.imsglobal.org/xsd/imscp_v1p1"
xmlns:imsss = "http://www.imsglobal.org/xsd/imsss"
xmlns:xsi = "http://www.w3.org/2001/XMLSchema-instance"
xsi:schemaLocation = "http://www.imsglobal.org/xsd/imsss Schemas/imsss_v1p0.xsd
http://www.imsglobal.org/xsd/imscp_v1p1 Schemas/imscp_v1p1p3.xsd"
identifier = "BBT_TLCExamplePostTest">
<!-- This manifest contains a solution to the following ID Problem:
* Deliver content, then post-test
* If student doesn't pass the post-test, deliver remediation, then repeat the content and post-test
-->
<organizations>
<organization identifier = "Organization">
<item identifier = "Unit">
<item identifier = "Content"/>
<item identifier = "Posttest">
<imsss:sequencing>
<imsss:objectives>
<imsss:primaryObjective objectiveID = "posttest1" satisfiedByMeasure = "true">
<imsss:mapInfo targetObjectiveID = "content1" readSatisfiedStatus = "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier = "Remediation">
<imsss:sequencing>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition = "satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action = "skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:objectives>
<imsss:primaryObjective objectiveID = "remediation1">
<imsss:mapInfo targetObjectiveID = "content1" readSatisfiedStatus = "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<imsss:sequencing>
<imsss:controlMode choice = "false" flow = "true" forwardOnly = "true"/>
<imsss:sequencingRules>
<imsss:postConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition = "satisfied" operator = "not"/>
</imsss:ruleConditions>
<imsss:ruleAction action = "retry"/>
</imsss:postConditionRule>
</imsss:sequencingRules>
<imsss:objectives>
<imsss:primaryObjective objectiveID = "unit1">
<imsss:mapInfo targetObjectiveID="content1" readSatisfiedStatus= "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
</organization>
</organizations>
<resources/>
</manifest>

4.2 Example of Sequencing Rules

Sequencing rules are defined by the type of condition present in the rule. Preconditions are actions that control sequencing decisions and delivery of a specific activity. Rules that include such actions are used to determine if the activity will be delivered. Exit conditions include actions that terminate an activity. Rules that include such actions are applied when a descendent of an activity exits. Post conditions are actions that control sequencing flow by issuing sequencing requests. Rules that include such actions are applied when an activity exits.

Diagram of basic sequencing rules

Figure 4.3 - Diagram of basic sequencing rules.

This is an example of how pre-condition rules can be used to deliver material passed on a pre-test:

<?xml version = "1.0" encoding = "UTF-8"?>
<manifest xmlns = "http://www.imsglobal.org/xsd/imscp_v1p1"
xmlns:imsss = "http://www.imsglobal.org/xsd/imsss"
xmlns:xsi = "http://www.w3.org/2001/XMLSchema-instance"
xsi:schemaLocation = "http://www.imsglobal.org/xsd/imsss Schemas/imsss_v1p0.xsd
http://www.imsglobal.org/xsd/imscp_v1p1 Schemas/imscp_v1p1p3.xsd"
identifier = "BBT_TLCExamplePostTest">
<!-- This manifest contains a solution to the following ID Problem:
* Require pretest before content
* Deliver material based on score in pretest
* N < 25% => Remediation then General
* 25% < N < 75% => General only
* 75% < N < 90% => General then Advanced
* N > 90% => Advanced only
* Allow student to choose any material, regardless of score
-->
<organizations>
<organization identifier = "Organization">
<item identifier = "Course">
<item identifier = "Pretest">
<imsss:sequencing>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition = "attempted"
operator = "not"/>
</imsss:ruleConditions>
<imsss:ruleAction action = "stopForwardTraversal"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:objectives objectiveID = "pretest1">
<imsss:primaryObjective>
<imsss:mapInfo targetObjectiveID = "content1"
writeSatisfiedStatus = "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier = "Content" isvisible = "false">
<item identifier = "Remediation">
<imsss:sequencing>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition =
"objectiveMeasureGreaterThan"
referencedObjective = "remediation1"
measureThreshold = "0.25"/>
</imsss:ruleConditions>
<imsss:ruleAction action = "skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:objectives>
<imsss:primaryObjective objectiveID = "remediation1">
<imsss:mapInfo targetObjectiveID = "content1"
readSatisfiedStatus = "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier = "General">
<imsss:sequencing>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition =
"objectiveMeasureGreaterThan"
referencedObjective = "general1"
measureThreshold = "0.90"/>
</imsss:ruleConditions>
<imsss:ruleAction action = "skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:objectives>
<imsss:primaryObjective objectiveID = "general1">
<imsss:mapInfo targetObjectiveID = "content1"
readSatisfiedStatus = "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier = "Advanced">
<imsss:sequencing>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition =
"objectiveMeasureLessThan"
referencedObjective = "advanced1"
measureThreshold = "0.75"/>
</imsss:ruleConditions>
<imsss:ruleAction action = "skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:objectives>
<imsss:primaryObjective objectiveID = "advanced1">
<imsss:mapInfo targetObjectiveID = "content1"
readSatisfiedStatus = "true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<imsss:sequencing>
<imsss:controlMode choice = "true" flow="true" forwardOnly = "false"/>
</imsss:sequencing>
</item>
<imsss:sequencing>
<imsss:controlMode choice = "false" flow = "true" forwardOnly = "true"/>
</imsss:sequencing>
</item>
</organization>
</organizations>
<resources/>
</manifest>

4.3 Example of Rollup Rules

Multiple rollup rules can be associated with a cluster or activity. The child activity set defines when the rule is triggered based on the rollup conditions of its children. These include all, any, none, at least count, and at least percent. Rollup conditions include satisfied, objective status known, objective measure known, etc. Finally, a number of rollup actions are defined including: satisfied, not satisfied, and completed.

Here is an example of rollup rules, presented as sequencing information outside of a manifest:

<?xml version = "1.0" encoding = "UTF-8"?>
<!--Generated by Turbo XML 2.3.1.100. Conforms to w3c http://www.w3.org/2001/XMLSchema-->
<xs:schema xmlns = "http://www.imsglobal.org/xsd/imsss"
targetNamespace = "http://www.imsglobal.org/xsd/imsss"
xmlns:xs = "http://www.w3.org/2001/XMLSchema"
elementFormDefault = "qualified"
attributeFormDefault = "unqualified">
<xs:include schemaLocation = "imsss_v1p0util.xsd"/>

<xs:complexType name = "rollupRuleType">
<xs:sequence>
<xs:element name = "rollupCondition" maxOccurs = "unbounded" block = "#all">
<xs:complexType>
<xs:attribute name = "operator" default = "noOp" type = "conditionOperatorType"/>
<xs:attribute name = "condition" use = "required" type = "rollupRuleConditionType"/>
</xs:complexType>
</xs:element>
<xs:element name = "rollupAction" block = "#all">
<xs:complexType>
<xs:attribute name = "action" use = "required" type = "rollupActionType"/>
</xs:complexType>
</xs:element>
</xs:sequence>
<xs:attribute name = "childActivitySet" default = "all" type = "childActivityType"/>
<xs:attribute name = "minimumCount" default = "0" type = "xs:integer"/>
<xs:attribute name = "minimumPercent" default = "0" type = "percentType"/>
<xs:attribute name = "conditionCombination" default = "any" type = "conditionCombinationType"/>
</xs:complexType>
<xs:complexType name = "rollupRulesType">
<xs:sequence>
<xs:element name = "rollupRule" type = "rollupRuleType" minOccurs = "0" maxOccurs = "unbounded"
block = "#all"/>
</xs:sequence>
<xs:attribute name = "rollupObjectiveSatisfied" default = "true" type = "xs:boolean"/>
<xs:attribute name = "rollupProgressCompletion" default = "true" type = "xs:boolean"/>
<xs:attribute name = "objectiveMeasureWeight" default = "1.0000" type = "weightType"/>
</xs:complexType>
</xs:schema>

4.4 Example of Limit Conditions

Limit conditions impose constraints on access to activities based on time of day, time spent on the activity, and number of attempts. Attempt limits prevent an activity from being accessed more than a given number of times. Absolute Duration limits access to a time duration based on the start and end time points. Experienced Duration limits access to the amount of time that the learner views an activity. Begin time limit indicates that an activity cannot be started before the time specified and end time limit indicates that it must be completed by the time point specified.

Some example of limit condition rules:

<?xml version = "1.0" encoding = "UTF-8"?>
<!--Generated by Turbo XML 2.3.1.100. Conforms to w3c http://www.w3.org/2001/XMLSchema-->
<xs:schema xmlns = "http://www.imsglobal.org/xsd/imsss"
targetNamespace = "http://www.imsglobal.org/xsd/imsss"
xmlns:xs = "http://www.w3.org/2001/XMLSchema"
elementFormDefault = "qualified"
attributeFormDefault = "unqualified">
<xs:complexType name = "limitConditionsType">
<xs:attribute name = "attemptLimit" type = "xs:nonNegativeInteger">
<xs:annotation>
<xs:documentation>Limit Condition Attempt Limit</xs:documentation>
</xs:annotation>
</xs:attribute>
<xs:attribute name = "attemptAbsoluteDurationLimit" type = "xs:duration" >
<xs:annotation>
<xs:documentation>Limit Condition Activity Attempt Absolute Duration Limit.
Typed as
xs:duration: see http://www.w3.org/TR/xmlschema-2/#duration</xs:documentation>
</xs:annotation>
</xs:attribute>
<xs:attribute name = "attemptExperiencedDurationLimit" type = "xs:duration">
<xs:annotation>
<xs:documentation>Limit Condition Activity Attempt Experienced Duration Limit.
Typed as
xs:duration: see http://www.w3.org/TR/xmlschema-2/#duration</xs:documentation>
</xs:annotation>
</xs:attribute>
<xs:attribute name = "activityAbsoluteDurationLimit" type = "xs:duration">
<xs:annotation>
<xs:documentation>Limit Condition Activity Absolute Duration Limit.
Typed as
xs:duration: see http://www.w3.org/TR/xmlschema-2/#duration</xs:documentation>
</xs:annotation>
</xs:attribute>
<xs:attribute name = "activityExperiencedDurationLimit" type = "xs:duration" >
<xs:annotation>
<xs:documentation>Limit Condition Activity Experienced Duration Limit.
Typed as
xs:duration: see http://www.w3.org/TR/xmlschema-2/#duration</xs:documentation>
</xs:annotation>
</xs:attribute>
<xs:attribute name = "beginTimeLimit" type = "xs:dateTime">
<xs:annotation>
<xs:documentation>Limit Condition Begin Time Limit</xs:documentation>
</xs:annotation>
</xs:attribute>
<xs:attribute name = "endTimeLimit" type = "xs:dateTime">
<xs:annotation>
<xs:documentation>Limit Condition End Time Limit</xs:documentation>
</xs:annotation>
</xs:attribute>
</xs:complexType>
</xs:schema>

4.5 Example of Learning Objectives

Each activity can have one or more educational objectives associated with it. The first objective in the list of objectives is considered to be the primary objective. Additional objectives may be included also. Each objective has a flag to indicate that some measure of completion has been satisfied along with an objective ID string which can be used to tie such measurements to a competency or objective management system (not included in this specification). The objective may contain a minimum normalized measure score, which is the number used to determine if completion is met. Finally, mapping information can be used to indicate how the measure is mapped onto an unspecified data model. If multiple objectives are present, then each instance must contain an objective ID.

An example of the use of objectives:

<?xml version = "1.0" encoding = "UTF-8"?>
<!--Generated by Turbo XML 2.3.1.100. Conforms to w3c http://www.w3.org/2001/XMLSchema-->
<xs:schema xmlns = "http://www.imsglobal.org/xsd/imsss"
targetNamespace = "http://www.imsglobal.org/xsd/imsss"
xmlns:xs = "http://www.w3.org/2001/XMLSchema"
elementFormDefault = "qualified"
attributeFormDefault = "unqualified">
<xs:include schemaLocation = "imsss_v1p0util.xsd"/>
<xs:complexType name = "objectiveType">
<xs:sequence>
<xs:element name = "minNormalizedMeasure" type = "measureType" default = "1.00000"
minOccurs = "0" block = "#all"/>
<xs:element name = "mapInfo" type = "objectiveMappingType" minOccurs = "0" block = "#all"/>
</xs:sequence>
<xs:attribute name = "satisfiedByMeasure" default = "false" type = "xs:boolean"/>
</xs:complexType>
<xs:complexType name = "objectivesType">
<xs:annotation>
<xs:documentation>The specification states: "Each activity must have one and only one objective that contributes to rollup". The following type describes an unbounded set of elements all named "objective" that do not contribute to rollup, and one element called "primaryObjective" that contributes to rollup.</xs:documentation>
</xs:annotation>
<xs:sequence>
<xs:element name = "primaryObjective" block = "#all">
<xs:annotation>
<xs:documentation>Contributes to rollup of the activity. </xs:documentation>
</xs:annotation>
<xs:complexType>
<xs:complexContent>
<xs:extension base = "objectiveType">
<xs:attribute name = "objectiveID" type = "xs:string"/>
</xs:extension>
</xs:complexContent>
</xs:complexType>
</xs:element>
<xs:element name = "objective" minOccurs = "0" maxOccurs = "unbounded" block = "#all">
<xs:annotation>
<xs:documentation>Does not contribute to the rollup of the activity.</xs:documentation>
</xs:annotation>
<xs:complexType>
<xs:complexContent>
<xs:extension base = "objectiveType">
<xs:attribute name = "objectiveID" use = "required" type = "xs:string"/>
</xs:extension>
</xs:complexContent>
</xs:complexType>
</xs:element>
</xs:sequence>
</xs:complexType>
<xs:complexType name = "objectiveMappingType">
<xs:annotation>
<xs:documentation>The type that describes an individual objective mapping. Mapping one local objective
GUID to one global objective GUID</xs:documentation>
</xs:annotation>
<xs:attribute name = "targetObjectiveID" use = "required" type = "xs:string"/>
<xs:attribute name = "readSatisfiedStatus" default = "true" type = "xs:boolean"/>
<xs:attribute name = "readNormalizedMeasure" default = "true" type = "xs:boolean"/>
<xs:attribute name = "writeSatisfiedStatus" default = "false" type = "xs:boolean"/>
<xs:attribute name = "writeNormalizedMeasure" default = "false" type = "xs:boolean"/>
</xs:complexType>
</xs:schema>

4.6 Example of Auxiliary Resources

Auxiliary resources may be associated with an activity node. These resources allow additional material to be associated with an activity beyond the main content objects. This in turn allows glossary entries, help text, interactive manual pages, etc. to be defined and associated with an activity.

Example of auxiliary resources in use:

<?xml version="1.0" encoding="UTF-8"?>
<!--Generated by Turbo XML 2.3.1.100. Conforms to w3c http://www.w3.org/2001/XMLSchema-->
<xs:schema targetNamespace="http://www.imsglobal.org/xsd/imsss" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns="http://www.imsglobal.org/xsd/imsss" elementFormDefault="qualified" attributeFormDefault="unqualified">
<xs:include schemaLocation="imsss_v1p0util.xsd"/>
<xs:complexType name="auxiliaryResourceType">
<xs:attribute name="auxiliaryResourceID" type="xs:string" use="required"/>
<xs:attribute name="purpose" type="xs:string" use="required"/>
</xs:complexType>
<xs:complexType name="auxiliaryResourcesType">
<xs:sequence>
<xs:element name="auxiliaryResource" minOccurs="0" maxOccurs="unbounded"
type="auxiliaryResourceType" block = "#all"/>
</xs:sequence>
</xs:complexType>
</xs:schema>

5. Advanced Examples

The following examples illustrate two more advanced examples of sequencing showing remediation and datamapping. Each is based on a set of modules that teach a short course on Photoshop.

Diagram Symbols

Each example is accompanied by a diagram which shows the course structure in a visual format. The small circles represent sequencing or rollup rules. They are color-coded and associated with the activities they apply to. The large (green) circles represent the order in which the associated activity is sequencing during flow (start, continue, or previous) sequencing requests. The blue ovals represent the objective associated with the activity. An implicit objective mapping is not represented in the diagrams - all objectives (blue ovals) exist both locally and globally (with the same name); pretests write local to global objectives, lessons only read, and posttests both read and write.

The outer bold box in each diagram represents the 'root' activity. Nested boxes represent clusters.

The example Photoshop course consists of several content pieces: an introduction, five modules that contain some number of lessons, and an assessment for each module that consists of five questions. These pieces are reused to illustrate various learning strategies by organizing the pieces in different ways and by applying sequencing rules to the resultant content aggregation.

5.1 Photoshop - Remediation

Choice is not allowed anywhere in the content aggregation. The learner is directed from the introduction to each lesson of the five modules in order. The learner decides when to progress through the content and in what direction by signaling continue and previous events. After all of the modules are experienced, the learner is presented an assessment that consists of all twenty-five questions divided into five, five question parts. The learner 'satisfies' one part of the assessment if they get 80% of the questions correct; 'satisfying' a part of the assessment also 'satisfies' the associated module's objective. After the assessment, the learner is directed through any modules, in order, whose associated objective has not been 'satisfied'; 'satisfied' modules are skipped. The learner decides when to progress through the content and in what direction, by signaling continue and previous events. After the required modules are experienced, the learner is presented a post-test that consists of all twenty-five questions divided into five, five question parts. The learner is only presented post-test parts that correspond to module objectives that where not 'satisfied' in the first assessment; 'satisfied' modules are skipped. The learner 'satisfies' one part of the assessment if they get 80% of the questions correct; 'satisfying' a part of the assessment also 'satisfies' the associated module's objective. The content aggregation exits after the leaner has experienced or skipped each piece of content at least once.

Photoshop Course - Remediation

Figure 5.1 - Photoshop Course - Remediation.

The following XML example shows how sequencing rules can be used to implement remediation. Careful note should be made of how objectives are used by the rules to determine which activity is made available to the learner.

<?xml version="1.0" standalone="no" ?>

<manifest identifier="photo-MANIFEST-remediation" version="1.2"
xmlns="http://www.imsglobal.org/xsd/imscp_v1p1"
xmlns:adlcp="http://www.adlnet.org/xsd/adlcp_v1p3"
xmlns:imsss = "http://www.imsglobal.org/xsd/imsss"
xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"
xsi:schemaLocation="http://www.imsglobal.org/xsd/imscp_v1p1 imscp_v1p1p3.xsd
http://www.imsglobal.org/xsd/imsmd_v1p2 imsmd_v1p2p2.xsd
http://www.adlnet.org/xsd/adlcp_v1p3 adlcp_rootv1p3.xsd
http://www.imsglobal.org/xsd/imsss imsss_v1p0.xsd" >

<metadata>
<schema>IMS Content</schema>
<schemaversion>1.2</schemaversion>
<lom xmlns="http://www.imsglobal.org/xsd/imsmd_v1p2" >
<general>
<title>
<langstring xml:lang="en-US">Photoshop Tutorial</langstring>
</title>
<description>
<langstring xml:lang="en-US">This tutorial provides you with an overview of the basic skills of Photoshop.</langstring>
</description>
<keyword>
<langstring xml:lang="en-US">Blending Images, Enhancing Images, Special Effects, Basic Skills.</langstring>
</keyword>
</general>
</lom>
</metadata>
<organizations default="TOC1">
<organization identifier="TOC1">
<title>Photoshop Tutorial</title>
<item identifier="INTRO" identifierref="RESOURCE30">
<title>Photoshop Introduction</title>
<imsss:sequencing>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
</imsss:sequencing>
</item>
<item identifier="MODULE1">
<item identifier="ITEM1" identifierref="RESOURCE1">
<title>Photoshop Lesson 1</title>
</item>
<item identifier="ITEM12" identifierref="RESOURCE12">
<title>Photoshop Toolbox Lesson 2</title>
</item>
<item identifier="ITEM17" identifierref="RESOURCE17">
<title>Photoshop Palettes Lesson 3</title>
</item>
<item identifier="ITEM18" identifierref="RESOURCE18">
<title>Photoshop Layers Lesson 4</title>
</item>
<item identifier="ITEM19" identifierref="RESOURCE19">
<title>Photoshop File Types Lesson 5</title>
</item>
<item identifier="ITEM20" identifierref="RESOURCE20">
<title>Photoshop Resolution Lesson 6</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
</imsss:sequencing>
</item>
<item identifier="MODULE2">
<item identifier="ITEM21" identifierref="RESOURCE21">
<title>Photoshop Color Balance Lesson 7</title>
</item>
<item identifier="ITEM22" identifierref="RESOURCE22">
<title>Photoshop Brightness and Contrast Lesson 8</title>
</item>
<item identifier="ITEM23" identifierref="RESOURCE23">
<title>Photoshop Hue and Saturation Lesson 9</title>
</item>
<item identifier="ITEM2" identifierref="RESOURCE2">
<title>Photoshop Cropping Lesson 10</title>
</item>
<item identifier="ITEM3" identifierref="RESOURCE3">
<title>Photoshop Cloning Stamp Lesson 11</title>
</item>
<item identifier="ITEM4" identifierref="RESOURCE4">
<title>Photoshop Blurring, Sharpening and Smudging Lesson 12</title>
</item>
<item identifier="ITEM5" identifierref="RESOURCE5">
<title>Photoshop Burn, Dodge and Sponge Tools Lesson 13</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
</imsss:sequencing>
</item>
<item identifier="MODULE3">
<item identifier="ITEM6" identifierref="RESOURCE6">
<title>Photoshop Selection Tools Lesson 14</title>
</item>
<item identifier="ITEM7" identifierref="RESOURCE7">
<title>Photoshop Transforming Lesson 15</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
</imsss:sequencing>
</item>
<item identifier="MODULE4">
<item identifier="ITEM8" identifierref="RESOURCE8">
<title>Photoshop Filters Lesson 16</title>
</item>
<item identifier="ITEM9" identifierref="RESOURCE9">
<title>Photoshop Effects Lesson 17</title>
</item>
<item identifier="ITEM10" identifierref="RESOURCE10">
<title>Photoshop Opacity Lesson 18</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
</imsss:sequencing>
</item>
<item identifier="MODULE5">
<item identifier="ITEM11" identifierref="RESOURCE11">
<title>Photoshop Color Picker Lesson 19</title>
</item>
<item identifier="ITEM13" identifierref="RESOURCE13">
<title>Photoshop Type Tool Lesson 20</title>
</item>
<item identifier="ITEM14" identifierref="RESOURCE14">
<title>Photoshop Paint Tools Lesson 21</title>
</item>
<item identifier="ITEM15" identifierref="RESOURCE15">
<title>Photoshop Vector Tools Lesson 22</title>
</item>
<item identifier="ITEM16" identifierref="RESOURCE16">
<title>Photoshop Gradients Lesson 23</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
</imsss:sequencing>
</item>
<item identifier="FIRSTEXAM">
<item identifier="FIRSTEXAM_PART1">
<item identifier="ITEM40" identifierref="QUESTION1"/>
<item identifier="ITEM41" identifierref="QUESTION2"/>
<item identifier="ITEM42" identifierref="QUESTION3"/>
<item identifier="ITEM43" identifierref="QUESTION4"/>
<item identifier="ITEM44" identifierref="QUESTION5"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_1" readSatisfiedStatus="false" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="FIRSTEXAM_PART2">
<item identifier="ITEM45" identifierref="QUESTION6"/>
<item identifier="ITEM46" identifierref="QUESTION7"/>
<item identifier="ITEM47" identifierref="QUESTION8"/>
<item identifier="ITEM48" identifierref="QUESTION9"/>
<item identifier="ITEM49" identifierref="QUESTION10"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_2" readSatisfiedStatus="false" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="FIRSTEXAM_PART3">
<item identifier="ITEM50" identifierref="QUESTION11"/>
<item identifier="ITEM51" identifierref="QUESTION12"/>
<item identifier="ITEM52" identifierref="QUESTION13"/>
<item identifier="ITEM53" identifierref="QUESTION14"/>
<item identifier="ITEM54" identifierref="QUESTION15"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_3" readSatisfiedStatus="false" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="FIRSTEXAM_PART4">
<item identifier="ITEM55" identifierref="QUESTION16"/>
<item identifier="ITEM56" identifierref="QUESTION17"/>
<item identifier="ITEM57" identifierref="QUESTION18"/>
<item identifier="ITEM58" identifierref="QUESTION19"/>
<item identifier="ITEM59" identifierref="QUESTION20"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_4" readSatisfiedStatus="false" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="FIRSTEXAM_PART5">
<item identifier="ITEM60" identifierref="QUESTION21"/>
<item identifier="ITEM61" identifierref="QUESTION22"/>
<item identifier="ITEM62" identifierref="QUESTION23"/>
<item identifier="ITEM63" identifierref="QUESTION24"/>
<item identifier="ITEM64" identifierref="QUESTION25"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_5" readSatisfiedStatus="false" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
</imsss:sequencing>
</item>
<item identifier="REMEDIATION_MODULE1">
<item identifier="ITEM70" identifierref="RESOURCE1">
<title>Photoshop Lesson 1</title>
</item>
<item identifier="ITEM71" identifierref="RESOURCE12">
<title>Photoshop Toolbox Lesson 2</title>
</item>
<item identifier="ITEM72" identifierref="RESOURCE17">
<title>Photoshop Palettes Lesson 3</title>
</item>
<item identifier="ITEM73" identifierref="RESOURCE18">
<title>Photoshop Layers Lesson 4</title>
</item>
<item identifier="ITEM74" identifierref="RESOURCE19">
<title>Photoshop File Types Lesson 5</title>
</item>
<item identifier="ITEM75" identifierref="RESOURCE20">
<title>Photoshop Resolution Lesson 6</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
<imsss:objectives>
<imsss:primaryObjective>
<imsss:mapInfo targetObjectiveID="obj_module_1" readSatisfiedStatus="true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="REMEDIATION_MODULE2">
<item identifier="ITEM76" identifierref="RESOURCE21">
<title>Photoshop Color Balance Lesson 7</title>
</item>
<item identifier="ITEM77" identifierref="RESOURCE22">
<title>Photoshop Brightness and Contrast Lesson 8</title>
</item>
<item identifier="ITEM78" identifierref="RESOURCE23">
<title>Photoshop Hue and Saturation Lesson 9</title>
</item>
<item identifier="ITEM79" identifierref="RESOURCE2">
<title>Photoshop Cropping Lesson 10</title>
</item>
<item identifier="ITEM80" identifierref="RESOURCE3">
<title>Photoshop Cloning Stamp Lesson 11</title>
</item>
<item identifier="ITEM81" identifierref="RESOURCE4">
<title>Photoshop Blurring, Sharpening and Smudging Lesson 12</title>
</item>
<item identifier="ITEM82" identifierref="RESOURCE5">
<title>Photoshop Burn, Dodge and Sponge Tools Lesson 13</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
<imsss:objectives>
<imsss:primaryObjective>
<imsss:mapInfo targetObjectiveID="obj_module_2" readSatisfiedStatus="true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="REMEDIATION_MODULE3">
<item identifier="ITEM83" identifierref="RESOURCE6">
<title>Photoshop Selection Tools Lesson 14</title>
</item>
<item identifier="ITEM84" identifierref="RESOURCE7">
<title>Photoshop Transforming Lesson 15</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
<imsss:objectives>
<imsss:primaryObjective>
<imsss:mapInfo targetObjectiveID="obj_module_3" readSatisfiedStatus="true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="REMEDIATION_MODULE4">
<item identifier="ITEM85" identifierref="RESOURCE8">
<title>Photoshop Filters Lesson 16</title>
</item>
<item identifier="ITEM86" identifierref="RESOURCE9">
<title>Photoshop Effects Lesson 17</title>
</item>
<item identifier="ITEM87" identifierref="RESOURCE10">
<title>Photoshop Opacity Lesson 18</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
<imsss:objectives>
<imsss:primaryObjective>
<imsss:mapInfo targetObjectiveID="obj_module_4" readSatisfiedStatus="true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="REMEDIATION_MODULE5">
<item identifier="ITEM88" identifierref="RESOURCE11">
<title>Photoshop Color Picker Lesson 19</title>
</item>
<item identifier="ITEM89" identifierref="RESOURCE13">
<title>Photoshop Type Tool Lesson 20</title>
</item>
<item identifier="ITEM90" identifierref="RESOURCE14">
<title>Photoshop Paint Tools Lesson 21</title>
</item>
<item identifier="ITEM91" identifierref="RESOURCE15">
<title>Photoshop Vector Tools Lesson 22</title>
</item>
<item identifier="ITEM92" identifierref="RESOURCE16">
<title>Photoshop Gradients Lesson 23</title>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules rollupObjectiveSatisfied="false"/>
<imsss:objectives>
<imsss:primaryObjective>
<imsss:mapInfo targetObjectiveID="obj_module_5" readSatisfiedStatus="true"/>
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="SECONDEXAM">
<item identifier="SECONDEXAM_PART1">
<item identifier="ITEM140" identifierref="QUESTION1"/>
<item identifier="ITEM141" identifierref="QUESTION2"/>
<item identifier="ITEM142" identifierref="QUESTION3"/>
<item identifier="ITEM143" identifierref="QUESTION4"/>
<item identifier="ITEM144" identifierref="QUESTION5"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_1" readSatisfiedStatus="true" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="SECONDEXAM_PART2">
<item identifier="ITEM145" identifierref="QUESTION6"/>
<item identifier="ITEM146" identifierref="QUESTION7"/>
<item identifier="ITEM147" identifierref="QUESTION8"/>
<item identifier="ITEM148" identifierref="QUESTION9"/>
<item identifier="ITEM149" identifierref="QUESTION10"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_2" readSatisfiedStatus="true" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="SECONDEXAM_PART3">
<item identifier="ITEM150" identifierref="QUESTION11"/>
<item identifier="ITEM151" identifierref="QUESTION12"/>
<item identifier="ITEM152" identifierref="QUESTION13"/>
<item identifier="ITEM153" identifierref="QUESTION14"/>
<item identifier="ITEM154" identifierref="QUESTION15"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_3" readSatisfiedStatus="true" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="SECONDEXAM_PART4">
<item identifier="ITEM155" identifierref="QUESTION16"/>
<item identifier="ITEM156" identifierref="QUESTION17"/>
<item identifier="ITEM157" identifierref="QUESTION18"/>
<item identifier="ITEM158" identifierref="QUESTION19"/>
<item identifier="ITEM159" identifierref="QUESTION20"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_4" readSatisfiedStatus="true" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<item identifier="SECONDEXAM_PART5">
<item identifier="ITEM160" identifierref="QUESTION21"/>
<item identifier="ITEM161" identifierref="QUESTION22"/>
<item identifier="ITEM162" identifierref="QUESTION23"/>
<item identifier="ITEM163" identifierref="QUESTION24"/>
<item identifier="ITEM164" identifierref="QUESTION25"/>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
<imsss:sequencingRules>
<imsss:preConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="satisfied"/>
</imsss:ruleConditions>
<imsss:ruleAction action="skip"/>
</imsss:preConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="attempted"/>
</imsss:rollupConditions>
<imsss:rollupAction action="completed"/>
</imsss:rollupRule>
</imsss:rollupRules>
<imsss:objectives>
<imsss:primaryObjective satisfiedByMeasure="true">
<imsss:minNormalizedMeasure>0.8</imsss:minNormalizedMeasure>
<imsss:mapInfo targetObjectiveID="obj_module_5" readSatisfiedStatus="true" writeSatisfiedStatus="true" />
</imsss:primaryObjective>
</imsss:objectives>
</imsss:sequencing>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true" forwardOnly="true"/>
</imsss:sequencing>
</item>
<imsss:sequencing>
<imsss:controlMode choice="false" flow="true"/>
<imsss:sequencingRules>
<imsss:exitConditionRule>
<imsss:ruleConditions>
<imsss:ruleCondition condition="completed"/>
</imsss:ruleConditions>
<imsss:ruleAction action="exit"/>
</imsss:exitConditionRule>
</imsss:sequencingRules>
<imsss:rollupRules >
<imsss:rollupRule childActivitySet="all">
<imsss:rollupConditions>
<imsss:rollupCondition condition="satisfied"/>
</imsss:rollupConditions>
<imsss:rollupAction action="satisfied"/>
</imsss:rollupRule>
<imsss:rollupRule childActivitySet="any">
<imsss:rollupConditions>
<imsss:rollupCondition operator ="not" condition="satisfied"/>
</imsss:rollupConditions>
<imsss:rollupAction action="notSatisfied"/>
</imsss:rollupRule>
</imsss:rollupRules>
</imsss:sequencing>
</organization>
</organizations>
<resources>
<resource identifier="RESOURCE1" adlcp:scormtype="asset" type="webcontent" href="Lesson1.htm">
<file href="Lesson1.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle1.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/interfacesmall.jpg" />
<file href="images/pssidebar.gif" />
</resource>
<resource identifier="RESOURCE2" adlcp:scormtype="asset" type="webcontent" href="Lesson10.htm">
<file href="Lesson10.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/Joule-window5.jpg" />
<file href="images/LessonTitle10.gif" />
<file href="images/cropiconbig.gif" />
<file href="images/cropmarks.jpg" />
<file href="images/cropped.jpg" />
<file href="images/croptool.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
</resource>
<resource identifier="RESOURCE3" adlcp:scormtype="asset" type="webcontent" href="Lesson11.htm">
<file href="Lesson11.htm" />
<file href="images/11.gif" />
<file href="images/CloneBrushSelect.gif" />
<file href="images/CloneCrosshairs.gif" />
<file href="images/EndOfLesson.gif" />
<file href="images/Iowa-roadcloned.jpg" />
<file href="images/Iowa-roadnotcloned.jpg" />
<file href="images/LessonTitle11.gif" />
<file href="images/cloneiconbig.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
</resource>
<resource identifier="RESOURCE4" adlcp:scormtype="asset" type="webcontent" href="Lesson12.htm">
<file href="Lesson12.htm" />
<file href="images/BSSBrushSelect.gif" />
<file href="images/BSSTool.gif" />
<file href="images/BlurIconBig.gif" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle12.gif" />
<file href="images/Oriental-TreeEnhanced.jpg" />
<file href="images/Oriental-TreeOriginal.jpg" />
<file href="images/Pressure.gif" />
<file href="images/SharpenIconBig.gif" />
<file href="images/SmudgeIconBig.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
</resource>
<resource identifier="RESOURCE5" adlcp:scormtype="asset" type="webcontent" href="Lesson13.htm">
<file href="Lesson13.htm" />
<file href="images/BDSBrushSelect.gif" />
<file href="images/BDSTool.gif" />
<file href="images/BurnBar.gif" />
<file href="images/Circular-Gatenowindow.jpg" />
<file href="images/Circular-Gatewindow.jpg" />
<file href="images/DodgeBar.gif" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle13.gif" />
<file href="images/Mode.gif" />
<file href="images/Pressure.gif" />
<file href="images/Range.gif" />
<file href="images/SpongeBar.gif" />
<file href="images/burniconbig.gif" />
<file href="images/dodgeiconbig.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
<file href="images/spongeiconbig.gif" />
</resource>
<resource identifier="RESOURCE6" adlcp:scormtype="asset" type="webcontent" href="Lesson14.htm">
<file href="Lesson14.htm" />
<file href="images/Addition.gif" />
<file href="images/EndOfLesson.gif" />
<file href="images/IntersectionIcon.gif" />
<file href="images/LessonTitle14.gif" />
<file href="images/MagicWandBar.gif" />
<file href="images/MagicWandIcon.gif" />
<file href="images/Selection.gif" />
<file href="images/SubtractionIcon.gif" />
<file href="images/addtosubtractfromselection.gif" />
<file href="images/dafbackground.jpg" />
<file href="images/dafmagicselect.jpg" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/lassotools.gif" />
<file href="images/marqueetools.gif" />
<file href="images/originaldaf.jpg" />
<file href="images/pssidebar.gif" />
<file href="images/selectiontools.gif" />
<file href="images/singledafselection.jpg" />
</resource>
<resource identifier="RESOURCE7" adlcp:scormtype="asset" type="webcontent" href="Lesson15.htm">
<file href="Lesson15.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle15.gif" />
<file href="images/TransformFlyout.gif" />
<file href="images/birdfeeder.jpg" />
<file href="images/birdfeederdistort.gif" />
<file href="images/birdfeederflip.gif" />
<file href="images/birdfeederperspective.gif" />
<file href="images/birdfeederrotated.jpg" />
<file href="images/birdfeederscaled.jpg" />
<file href="images/birdfeederskewed.gif" />
<file href="images/box-distort.gif" />
<file href="images/box-flip.gif" />
<file href="images/box-perspective.gif" />
<file href="images/box-rotate.gif" />
<file href="images/box-scale.gif" />
<file href="images/box-skew.gif" />
<file href="images/box.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
<file href="images/transformCheck.gif" />
<file href="images/transformX.gif" />
</resource>
<resource identifier="RESOURCE8" adlcp:scormtype="asset" type="webcontent" href="Lesson16.htm">
<file href="Lesson16.htm" />
<file href="images/DistortFlyOut.gif" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle16.gif" />
<file href="images/distortfilters.gif" />
<file href="images/filters.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
<file href="images/renderfilters.gif" />
</resource>
<resource identifier="RESOURCE9" adlcp:scormtype="asset" type="webcontent" href="Lesson17.htm">
<file href="Lesson17.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/LayerStyleDialog.gif" />
<file href="images/LayerStyleIcon.gif" />
<file href="images/LessonTitle17.gif" />
<file href="images/SelectEffect1.gif" />
<file href="images/SelectEffect2.gif" />
<file href="images/TypingManColorOverlay.gif" />
<file href="images/TypingManFlat.gif" />
<file href="images/TypingManInnerBevel.gif" />
<file href="images/TypingManInnerBevelDropShad.gif" />
<file href="images/TypingManInnerGlow.gif" />
<file href="images/TypingManInnerShad.gif" />
<file href="images/TypingManOriginal.gif" />
<file href="images/TypingManOuterGlow.gif" />
<file href="images/TypingManOuterShadow.gif" />
<file href="images/TypingManPillowEmboss.gif" />
<file href="images/TypingManStroke.gif" />
<file href="images/bevebosslayer.gif" />
<file href="images/box.gif" />
<file href="images/dafmultipleeffects.jpg" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/layerstyles.gif" />
<file href="images/layerstylespalettebox.gif" />
<file href="images/pssidebar.gif" />
</resource>
<resource identifier="RESOURCE10" adlcp:scormtype="asset" type="webcontent" href="Lesson18.htm">
<file href="Lesson18.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle18.gif" />
<file href="images/box.gif" />
<file href="images/daffbackground.jpg" />
<file href="images/dafopacity.jpg" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/layerbox.gif" />
<file href="images/pssidebar.gif" />
</resource>
<resource identifier="RESOURCE11" adlcp:scormtype="asset" type="webcontent" href="Lesson19.htm">
<file href="Lesson19.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle19.gif" />
<file href="images/box.gif" />
<file href="images/colordefault.gif" />
<file href="images/colorpantone.jpg" />
<file href="images/colorpickerdialog.gif" />
<file href="images/colorpickerdialog1.jpg" />
<file href="images/colorswap.gif" />
<file href="images/colortoolbox.gif" />
<file href="images/droppericon.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/pssidebar.gif" />
<file href="images/toolbox.gif" />
</resource>
<resource identifier="RESOURCE12" adlcp:scormtype="asset" type="webcontent" href="Lesson2.htm">
<file href="Lesson2.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/HandTool.gif" />
<file href="images/LessonTitle2.gif" />
<file href="images/ZoomToolIcon.gif" />
<file href="images/box.gif" />
<file href="images/colorselect.gif" />
<file href="images/enhancementtools.gif" />
<file href="images/eyedroppertool.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/navagationtools.gif" />
<file href="images/objecttools.gif" />
<file href="images/pssidebar.gif" />
<file href="images/selectiontools.gif" />
<file href="images/toolbox.gif" />
</resource>
<resource identifier="RESOURCE13" adlcp:scormtype="asset" type="webcontent" href="Lesson20.htm">
<file href="Lesson20.htm" />
<file href="images/EndOfLesson.gif" />
<file href="images/LessonTitle20.gif" />
<file href="images/TypeOptionsBar.gif" />
<file href="images/headerside.gif" />
<file href="images/headertop.gif" />
<file href="images/parapalette.gif" />
<file href="images/pssidebar.gif" />
<file href="images/typeCheck.gif" />
<file href="images/typeX.gif" />
<file href="images/typelayer.gif" />
<file href="images/typepalette.gif" />
<file href="images/typetool.gif" />
<file href="images/typetoolbig.gif" />
<file href="images/winterwonderland2.jpg" />
</resource>
<resource identifier="RESOURCE14" adlcp:scormtype="asset" type="webcontent" href="Lesson21.htm">
<file href="Lesson21.htm" />
<file href="images/AirBrushToolIcon.gif" />
<file href="images/AirBrushToolIconBig.gif" />
<file href="images