<?xml version="1.0"?>
<!-- edited with XML Spy v3.5 (http://www.xmlspy.com) by Thomas Wason (private) -->
<!-- filename=ims+cp+rootv1p1.xsd -->
<!-- Copyright (2) 2001 IMS Global Learning Consortium, Inc. -->
<!-- edited by Thomas Wason  -->
<!-- Conforms to w3c http://www.w3.org/TR/xmlschema-1/ 2000-10-24-->
<xsd:schema targetNamespace="http://www.imsproject.org/xsd/ims_cp_rootv1p1" xmlns="http://www.imsproject.org/xsd/ims_cp_rootv1p1" xmlns:imsmd="http://www.imsproject.org/xsd/ims_md_rootv1p1" xmlns:xsd="http://www.w3.org/2001/XMLSchema" elementFormDefault="unqualified" version="IMS CP 1.1DRAFT Schema 1.1DRAFT">
	<xsd:annotation>
		<xsd:documentation xml:lang="en">DRAFT XSD for IMS Content Packaging version 1.1 DRAFT</xsd:documentation>
		<xsd:documentation> Copyright (c) 2001 IMS GLC, Inc. </xsd:documentation>
		<xsd:documentation>2000-04-21, Adjustments by T.D. Wason from CP 1.0.</xsd:documentation>
		<xsd:documentation>2001-02-22, T.D.Wason: Modify for 2000-10-24 XML-Schema version.  Modified to support extension.</xsd:documentation>
		<xsd:documentation>2001-03-12, T.D.Wason: Change filename, target and meta-data namespaces and meta-data fielname.  Add meta-data to itemType, fileType and organizationType.</xsd:documentation>
		<xsd:documentation>Do not define namespaces for xml in XML instances generated from this xsd.</xsd:documentation>
		<xsd:documentation>Imports IMS meta-data xsd, lower case element names.         </xsd:documentation>
		<xsd:documentation>This XSD provides a reference to the IMS meta-data root element as imsmd:record</xsd:documentation>
		<xsd:documentation>If the IMS meta-data is to be used in the XML instance then the instance must define an IMS meta-data prefix with a namespace.  The meta-data targetNamespace should be used.  </xsd:documentation>
		<xsd:documentation>2001-03-20, Thor Anderson: Remove manifestref, change resourceref back to identifierref, change manifest back to contained by manifest. --Tom Wason: manifest may contain _none_ or more manifests.</xsd:documentation>
		<xsd:documentation>2001-04-13 Tom Wason: corrected attirbute name structure.  Was misnamed type.  </xsd:documentation>
		<xsd:documentation>2001-05-14 Schawn Thropp: Made all complexType extensible with the group.any</xsd:documentation>
		<xsd:documentation>Added the anyAttribute to all complexTypes. Changed the href attribute on the fileType and resourceType to xsd:string</xsd:documentation>
		<xsd:documentation>Changed the maxLength of the href, identifierref, parameters, structure attributes to match the Information model.</xsd:documentation>
	</xsd:annotation>
	<xsd:annotation>
		<xsd:documentation>Inclusions and Imports</xsd:documentation>
	</xsd:annotation>
	<xsd:import namespace="http://www.imsproject.org/xsd/ims_md_rootv1p1" schemaLocation="ims_md_rootv1p1.xsd"/>
	<xsd:import namespace="http://www.w3.org/XML/1998/namespace" schemaLocation="ims_xml.xsd"/>
	<xsd:annotation>
		<xsd:documentation>Attribute Declarations</xsd:documentation>
	</xsd:annotation>
	<xsd:attributeGroup name="attr.base">
		<xsd:attribute ref="xml:base" use="optional"/>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.default">
		<xsd:attribute name="default" type="xsd:IDREF" use="optional"/>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.href">
		<xsd:attribute name="href" use="optional">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="2000"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.href.req">
		<xsd:attribute name="href" use="required">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="2000"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.identifier.req">
		<xsd:attribute name="identifier" type="xsd:ID" use="required"/>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.identifier">
		<xsd:attribute name="identifier" type="xsd:ID" use="optional"/>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.imsmd">
		<xsd:attribute name="xmlns" default="http://www.imsproject.org/xsd/ims_md_rootv1p1"/>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.isvisible">
		<xsd:attribute name="isvisible" type="xsd:boolean" use="optional"/>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.parameters">
		<xsd:attribute name="parameters" use="optional">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="1000"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.identifierref">
		<xsd:attribute name="identifierref" use="optional">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="2000"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.identifierref.req">
		<xsd:attribute name="identifierref" use="required">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="2000"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.resourcetype.req">
		<xsd:attribute name="type" default="webcontent">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="1000"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.structure.req">
		<xsd:attribute name="structure" default="hierarchical">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="200"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:attributeGroup name="attr.version">
		<xsd:attribute name="version" use="optional">
			<xsd:simpleType>
				<xsd:restriction base="xsd:string">
					<xsd:maxLength value="20"/>
				</xsd:restriction>
			</xsd:simpleType>
		</xsd:attribute>
	</xsd:attributeGroup>
	<xsd:annotation>
		<xsd:documentation>element groups</xsd:documentation>
	</xsd:annotation>
	<xsd:group name="grp.any">
		<xsd:annotation>
			<xsd:documentation>Any namespaced element from any namespace may be included within an &quot;any&quot; element.  The namespace for the imported element must be defined in the instance, and the schema must be imported.  </xsd:documentation>
		</xsd:annotation>
		<xsd:sequence>
			<xsd:any namespace="##other" processContents="strict" minOccurs="0" maxOccurs="unbounded"/>
		</xsd:sequence>
	</xsd:group>
	<!-- Elements Declarations -->
	<xsd:annotation>
		<xsd:documentation>Element Declarations</xsd:documentation>
	</xsd:annotation>
	<xsd:element name="dependency" type="dependencyType"/>
	<xsd:element name="file" type="fileType"/>
	<xsd:element name="item" type="itemType"/>
	<xsd:element name="manifest" type="manifestType"/>
	<xsd:element name="metadata" type="metadataType"/>
	<xsd:element name="organization" type="organizationType"/>
	<xsd:element name="organizations" type="organizationsType"/>
	<xsd:element name="resource" type="resourceType"/>
	<xsd:element name="resources" type="resourcesType"/>
	<xsd:element name="schema" type="schemaType"/>
	<xsd:element name="schemaversion" type="schemaversionType"/>
	<xsd:element name="title" type="titleType"/>
	<!-- complexTypes -->
	<xsd:complexType name="dependencyType">
		<xsd:sequence>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.identifierref.req"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="fileType">
		<xsd:sequence>
			<xsd:element ref="metadata" minOccurs="0"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.href.req"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="itemType">
		<xsd:sequence>
			<xsd:element ref="title" minOccurs="0"/>
			<xsd:element ref="item" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:element ref="metadata" minOccurs="0"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.identifier.req"/>
		<xsd:attributeGroup ref="attr.identifierref"/>
		<xsd:attributeGroup ref="attr.isvisible"/>
		<xsd:attributeGroup ref="attr.parameters"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="manifestType">
		<xsd:sequence>
			<xsd:element ref="metadata" minOccurs="0"/>
			<xsd:element ref="organizations"/>
			<xsd:element ref="resources"/>
			<xsd:element ref="manifest" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.identifier.req"/>
		<xsd:attributeGroup ref="attr.version"/>
		<xsd:attribute ref="xml:base"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="metadataType">
		<xsd:sequence>
			<xsd:element ref="schema" minOccurs="0"/>
			<xsd:element ref="schemaversion" minOccurs="0"/>
			<xsd:element ref="imsmd:record" minOccurs="0"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
	</xsd:complexType>
	<xsd:complexType name="organizationsType">
		<xsd:sequence>
			<xsd:element ref="organization" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.default"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="organizationType">
		<xsd:sequence>
			<xsd:element ref="title" minOccurs="0"/>
			<xsd:element ref="item" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:element ref="metadata" minOccurs="0"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.identifier.req"/>
		<xsd:attributeGroup ref="attr.structure.req"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="resourcesType">
		<xsd:sequence>
			<xsd:element ref="resource" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.base"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:complexType name="resourceType">
		<xsd:sequence>
			<xsd:element ref="metadata" minOccurs="0"/>
			<xsd:element ref="file" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:element ref="dependency" minOccurs="0" maxOccurs="unbounded"/>
			<xsd:group ref="grp.any"/>
		</xsd:sequence>
		<xsd:attributeGroup ref="attr.identifier.req"/>
		<xsd:attributeGroup ref="attr.resourcetype.req"/>
		<xsd:attributeGroup ref="attr.base"/>
		<xsd:attributeGroup ref="attr.href"/>
		<xsd:anyAttribute namespace="##other" processContents="strict"/>
	</xsd:complexType>
	<xsd:simpleType name="schemaType">
		<xsd:restriction base="xsd:string">
			<xsd:maxLength value="100"/>
		</xsd:restriction>
	</xsd:simpleType>
	<xsd:simpleType name="schemaversionType">
		<xsd:restriction base="xsd:string">
			<xsd:maxLength value="20"/>
		</xsd:restriction>
	</xsd:simpleType>
	<xsd:simpleType name="titleType">
		<xsd:restriction base="xsd:string">
			<xsd:maxLength value="200"/>
		</xsd:restriction>
	</xsd:simpleType>
</xsd:schema>
