<?xml version = "1.0" encoding = "UTF-8"?>
<xs:schema xmlns="http://ltsc.ieee.org/xsd/LOM"
    targetNamespace="http://ltsc.ieee.org/xsd/LOM"
    xmlns:xs="http://www.w3.org/2001/XMLSchema"
    xmlns:sch="http://purl.oclc.org/dsdl/schematron"
    version="IMS MD 1.3.2"
    elementFormDefault="qualified"
    attributeFormDefault="unqualified">
    <xs:annotation>
        <xs:documentation>
            XSD Data File Information
            -------------------------
            Author:         Colin Smythe
            Date:           30th April, 2012
            Version:        1.3.2
            Status:         Final
            Description:    This is the IMS GLC Meta-data v1.3 binding of the IEEE LOMv1.0.
                            This is a Loose binding of LOMv1.0.  The strict multiplicity of elements 
                            has been imposed, there is no vocabulary validation and extensions are 
                            permitted as elements and attributes.

            History:        Version 1.3: This replaces the IMS GLC Metadata v1.2.4 binding;
                            Version 1.3.1: Small bug correction i.e. change 'datetime' to 'dateTime';
                            Version 1.3.2: Corrects the use of the 'Type' class for the 'type' attribute in the 'OrComposite' class.

            License:        IPR, License and Distribution Notices

                            This machine readable file is derived from IMS Global Learning Consortium (GLC) specification IMS Meta-data (LOM) Version 1.3
                            found at http://www.imsglobal.org/metadata and the original IMS GLC schema binding or code base
                            http://www.imsglobal.org/metadata.

                            Recipients of this document are requested to submit, with their comments, notification of any
                            relevant patent claims or other intellectual property rights of which they may be aware that might be
                            infringed by the schema binding contained in this document.

                            IMS GLC takes no position regarding the validity or scope of any intellectual property or other
                            rights that might be claimed to pertain to the implementation or use of the technology described in this
                            document or the extent to which any license under such rights might or might not be available; neither
                            does it represent that it has made any effort to identify any such rights. Information on IMS GLCs
                            procedures with respect to rights in IMS GLC specifications can be found at the IMS GLC Intellectual Property
                            Rights web page: http://www.imsglobal.org/ipr/imsipr_policyFinal.pdf.

                            Copyright (c) IMS Global Learning Consortium 1999-2012. All Rights Reserved.

                            License Notice for Users

                            Users of products or services that include this document are hereby granted a worldwide, royalty-free, 
                            non-exclusive license to use this document. 

                            Distribution Notice for Developers

                            Developers of products or services that are not original incorporators of this document and 
                            have not changed this document, that is, are distributing a software product that incorporates this 
                            document as is from a third-party source other than IMS, are hereby granted permission to copy,
                            display and distribute the contents of this document in any medium for any purpose without fee or 
                            royalty provided that you include this IPR, License and Distribution notice in its entirety on ALL
                            copies, or portions thereof.

                            Developers of products or services that are original incorporators of this document and wish 
                            to provide distribution of this document as is or with modifications and developers of products and 
                            services that are not original incorporators of this document and have changed this document, are
                            required to register with the IMS GLC community on the IMS GLC website as described in the following two
                            paragraphs:-

                            *  If you wish to distribute this document as is, with no modifications, you are hereby granted 
                               permission to copy, display and distribute the contents of this document in any medium for any 
                               purpose without fee or royalty provided that you include this IPR, License and Distribution notice in
                               its entirety on ALL copies, or portions thereof, that you make and you complete a valid license 
                               registration with IMS and receive an email from IMS granting the license. To register, follow the 
                               instructions on the IMS website: http://www.imsglobal.org/specificationdownload.cfm. Once 
                               registered you are granted permission to transfer unlimited distribution rights of this document for the 
                               purposes of third-party or other distribution of your product or service that incorporates this 
                               document as long as this IPR, License and Distribution notice remains in place in its entirety; 

                            *  If you wish to create and distribute a derived work from this document, you are hereby 
                               granted permission to copy, display and distribute the contents of the derived work in any medium for 
                               any purpose without fee or royalty provided that you include this IPR, License and Distribution 
                               notice in its entirety on ALL copies, or portions thereof, that you make and you complete a valid 
                               profile registration with IMS GLC and receive an email from IMS GLC granting the license. To register, follow
                               the instructions on the IMS GLC website: http://www.imsglobal.org/profile/. Once registered you are 
                               granted permission to transfer unlimited distribution rights of the derived work for the purposes of 
                               third-party or other distribution of your product or service that incorporates the derived work as long 
                               as this IPR, License and Distribution notice remains in place in its entirety. 

                            The limited permissions granted above are perpetual and will not be revoked by IMS GLC or its 
                            successors or assigns.

                            THIS SPECIFICATION IS BEING OFFERED WITHOUT ANY WARRANTY WHATSOEVER, AND IN PARTICULAR, ANY WARRANTY OF NONINFRINGEMENT IS
                            EXPRESSLY DISCLAIMED. ANY USE OF THIS SPECIFICATION SHALL BE MADE ENTIRELY AT THE IMPLEMENTERS OWN RISK, AND NEITHER THE CONSORTIUM
                            NOR ANY OF ITS MEMBERS OR SUBMITTERS, SHALL HAVE ANY LIABILITY WHATSOEVER TO ANY IMPLEMENTER OR THIRD PARTY FOR ANY DAMAGES OF
                            ANY NATURE WHATSOEVER, DIRECTLY OR INDIRECTLY, ARISING FROM THE USE OF THIS SPECIFICATION.

            Source UML File Information
            ---------------------------
            The source file information must be supplied as an XMI file (without diagram layout information).
            The supported UML authoring tools are:
            (a) Poseidon - v6 (and later)

            Source XSLT File Information
            ----------------------------
            XSL Generator:    UMLtoXSDTransformv1p0.xsl
            XSLT Processor:   Xalan
            Release:          1.0
            Date:             31st March, 2012
            Autogen Engineer: Colin Smythe (IMS GLC, UK)
            Autogen Date:     2012-04-16

            IMS GLC Auto-generation Binding Tool-kit (I-BAT)
            ------------------------------------------------
            This file was auto-generated using the IMS GLC Binding Auto-generation Tool-kit (I-BAT).  While every
            attempt has been made to ensure that this tool auto-generates the files correctly, users should be aware
            that this is an experimental tool.  Permission is given to make use of this tool.  IMS GLC makes no
            claim on the materials created by third party users of this tool.  Details on how to use this tool
            are contained in the IMS GLC "I-BAT" Documentation available at the IMS GLC web-site.

            Tool Copyright:  2005-2012 (c) IMS Global Learning Consortium Inc.  All Rights Reserved.
        </xs:documentation>
    </xs:annotation>

    <xs:annotation>
        <xs:documentation>
            Schematron Strict Selection Validation Rules
            --------------------------------------------
            This is the set of Schematron rules that have been created to enforce the use of the "Unordered" stereotype.
            These rules ensure that the number of entries in an unordered complexType of an element obey the multiplicity constraints.
            This is required so that any-order/any-multiplicity complexTypes can be constructed and validated.
        </xs:documentation>
        <xs:appinfo>
            <sch:ns uri="http://ltsc.ieee.org/xsd/LOM" prefix="lom"/>
            <sch:title>Schematron validation rules for the enforcement of the Unordered stereotype.</sch:title>

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="AggregationLevel.Type">
                <sch:title>[RULESET] For the AggregationLevel.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:general/lom:aggregationLevel">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Annotation.Type">
                <sch:title>[RULESET] For the Annotation.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:annotation">

                    <sch:assert test="count(lom:entity) = 0 or count(lom:entity) = 1">
                        [RULE for Local Attribute 1] Invalid number of "entity" elements: <sch:value-of select="count(lom:entity)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:date) = 0 or count(lom:date) = 1">
                        [RULE for Local Attribute 2] Invalid number of "date" elements: <sch:value-of select="count(lom:date)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 3] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Classification.Type">
                <sch:title>[RULESET] For the Classification.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:classification">

                    <sch:assert test="count(lom:purpose) = 0 or count(lom:purpose) = 1">
                        [RULE for Local Attribute 1] Invalid number of "purpose" elements: <sch:value-of select="count(lom:purpose)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 3] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Context.Type">
                <sch:title>[RULESET] For the Context.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:context">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="ContributeLifeCycle.Type">
                <sch:title>[RULESET] For the ContributeLifeCycle.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:lifeCycle/lom:contribute">

                    <sch:assert test="count(lom:role) = 0 or count(lom:role) = 1">
                        [RULE for Local Attribute 1] Invalid number of "role" elements: <sch:value-of select="count(lom:role)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:date) = 0 or count(lom:date) = 1">
                        [RULE for Local Attribute 3] Invalid number of "date" elements: <sch:value-of select="count(lom:date)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="ContributeMetaMetadata.Type">
                <sch:title>[RULESET] For the ContributeMetaMetadata.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:metaMetadata/lom:contribute">

                    <sch:assert test="count(lom:role) = 0 or count(lom:role) = 1">
                        [RULE for Local Attribute 1] Invalid number of "role" elements: <sch:value-of select="count(lom:role)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:date) = 0 or count(lom:date) = 1">
                        [RULE for Local Attribute 3] Invalid number of "date" elements: <sch:value-of select="count(lom:date)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="CopyrightAndOtherRestrictions.Type">
                <sch:title>[RULESET] For the CopyrightAndOtherRestrictions.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:rights/lom:copyrightAndOtherRestrictions">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Cost.Type">
                <sch:title>[RULESET] For the Cost.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:rights/lom:cost">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="DateTime.Type">
                <sch:title>[RULESET] For the DateTime.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:metaMetadata/lom:contribute/lom:date">

                    <sch:assert test="count(lom:dateTime) = 0 or count(lom:dateTime) = 1">
                        [RULE for Local Attribute 1] Invalid number of "dateTime" elements: <sch:value-of select="count(lom:dateTime)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 2] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

                <sch:rule abstract="false" context="lom:lom/lom:lifeCycle/lom:contribute/lom:date">

                    <sch:assert test="count(lom:dateTime) = 0 or count(lom:dateTime) = 1">
                        [RULE for Local Attribute 1] Invalid number of "dateTime" elements: <sch:value-of select="count(lom:dateTime)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 2] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

                <sch:rule abstract="false" context="lom:lom/lom:annotation/lom:date">

                    <sch:assert test="count(lom:dateTime) = 0 or count(lom:dateTime) = 1">
                        [RULE for Local Attribute 1] Invalid number of "dateTime" elements: <sch:value-of select="count(lom:dateTime)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 2] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Difficulty.Type">
                <sch:title>[RULESET] For the Difficulty.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:difficulty">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Duration.Type">
                <sch:title>[RULESET] For the Duration.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:technical/lom:duration">

                    <sch:assert test="count(lom:duration) = 0 or count(lom:duration) = 1">
                        [RULE for Local Attribute 1] Invalid number of "duration" elements: <sch:value-of select="count(lom:duration)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 2] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:typicalLearningTime">

                    <sch:assert test="count(lom:duration) = 0 or count(lom:duration) = 1">
                        [RULE for Local Attribute 1] Invalid number of "duration" elements: <sch:value-of select="count(lom:duration)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 2] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Educational.Type">
                <sch:title>[RULESET] For the Educational.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational">

                    <sch:assert test="count(lom:interactivityType) = 0 or count(lom:interactivityType) = 1">
                        [RULE for Local Attribute 1] Invalid number of "interactivityType" elements: <sch:value-of select="count(lom:interactivityType)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:interactivityLevel) = 0 or count(lom:interactivityLevel) = 1">
                        [RULE for Local Attribute 3] Invalid number of "interactivityLevel" elements: <sch:value-of select="count(lom:interactivityLevel)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:semanticDensity) = 0 or count(lom:semanticDensity) = 1">
                        [RULE for Local Attribute 4] Invalid number of "semanticDensity" elements: <sch:value-of select="count(lom:semanticDensity)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:difficulty) = 0 or count(lom:difficulty) = 1">
                        [RULE for Local Attribute 8] Invalid number of "difficulty" elements: <sch:value-of select="count(lom:difficulty)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:typicalLearningTime) = 0 or count(lom:typicalLearningTime) = 1">
                        [RULE for Local Attribute 9] Invalid number of "typicalLearningTime" elements: <sch:value-of select="count(lom:typicalLearningTime)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 10] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="General.Type">
                <sch:title>[RULESET] For the General.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:general">

                    <sch:assert test="count(lom:title) = 0 or count(lom:title) = 1">
                        [RULE for Local Attribute 2] Invalid number of "title" elements: <sch:value-of select="count(lom:title)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:structure) = 0 or count(lom:structure) = 1">
                        [RULE for Local Attribute 7] Invalid number of "structure" elements: <sch:value-of select="count(lom:structure)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:aggregationLevel) = 0 or count(lom:aggregationLevel) = 1">
                        [RULE for Local Attribute 8] Invalid number of "aggregationLevel" elements: <sch:value-of select="count(lom:aggregationLevel)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Identifier.Type">
                <sch:title>[RULESET] For the Identifier.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:metaMetadata/lom:identifier">

                    <sch:assert test="count(lom:catalog) = 0 or count(lom:catalog) = 1">
                        [RULE for Local Attribute 1] Invalid number of "catalog" elements: <sch:value-of select="count(lom:catalog)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:entry) = 0 or count(lom:entry) = 1">
                        [RULE for Local Attribute 2] Invalid number of "entry" elements: <sch:value-of select="count(lom:entry)"/>.
                    </sch:assert>

                </sch:rule>

                <sch:rule abstract="false" context="lom:lom/lom:general/lom:identifier">

                    <sch:assert test="count(lom:catalog) = 0 or count(lom:catalog) = 1">
                        [RULE for Local Attribute 1] Invalid number of "catalog" elements: <sch:value-of select="count(lom:catalog)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:entry) = 0 or count(lom:entry) = 1">
                        [RULE for Local Attribute 2] Invalid number of "entry" elements: <sch:value-of select="count(lom:entry)"/>.
                    </sch:assert>

                </sch:rule>

                <sch:rule abstract="false" context="lom:lom/lom:relation/lom:resource/lom:identifier">

                    <sch:assert test="count(lom:catalog) = 0 or count(lom:catalog) = 1">
                        [RULE for Local Attribute 1] Invalid number of "catalog" elements: <sch:value-of select="count(lom:catalog)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:entry) = 0 or count(lom:entry) = 1">
                        [RULE for Local Attribute 2] Invalid number of "entry" elements: <sch:value-of select="count(lom:entry)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="IntendedEndUserRole.Type">
                <sch:title>[RULESET] For the IntendedEndUserRole.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:intendedEndUserRole">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="InteractivityLevel.Type">
                <sch:title>[RULESET] For the InteractivityLevel.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:interactivityLevel">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="InteractivityType.Type">
                <sch:title>[RULESET] For the InteractivityType.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:interactivityType">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Kind.Type">
                <sch:title>[RULESET] For the Kind.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:relation/lom:kind">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="LearningResourceType.Type">
                <sch:title>[RULESET] For the LearningResourceType.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:learningResourceType">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="LifeCycle.Type">
                <sch:title>[RULESET] For the LifeCycle.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:lifeCycle">

                    <sch:assert test="count(lom:version) = 0 or count(lom:version) = 1">
                        [RULE for Local Attribute 1] Invalid number of "version" elements: <sch:value-of select="count(lom:version)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:status) = 0 or count(lom:status) = 1">
                        [RULE for Local Attribute 2] Invalid number of "status" elements: <sch:value-of select="count(lom:status)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="LOM.Type">
                <sch:title>[RULESET] For the LOM.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom">

                    <sch:assert test="count(lom:general) = 0 or count(lom:general) = 1">
                        [RULE for Root Class Attribute 1] Invalid number of "general" elements: <sch:value-of select="count(lom:general)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:lifeCycle) = 0 or count(lom:lifeCycle) = 1">
                        [RULE for Root Class Attribute 2] Invalid number of "lifeCycle" elements: <sch:value-of select="count(lom:lifeCycle)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:metaMetadata) = 0 or count(lom:metaMetadata) = 1">
                        [RULE for Root Class Attribute 3] Invalid number of "metaMetadata" elements: <sch:value-of select="count(lom:metaMetadata)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:technical) = 0 or count(lom:technical) = 1">
                        [RULE for Root Class Attribute 4] Invalid number of "technical" elements: <sch:value-of select="count(lom:technical)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:rights) = 0 or count(lom:rights) = 1">
                        [RULE for Root Class Attribute 6] Invalid number of "rights" elements: <sch:value-of select="count(lom:rights)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="MetaMetadata.Type">
                <sch:title>[RULESET] For the MetaMetadata.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:metaMetadata">

                    <sch:assert test="count(lom:language) = 0 or count(lom:language) = 1">
                        [RULE for Local Attribute 4] Invalid number of "language" elements: <sch:value-of select="count(lom:language)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Name.Type">
                <sch:title>[RULESET] For the Name.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:technical/lom:requirement/lom:orComposite/lom:name">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="OrComposite.Type">
                <sch:title>[RULESET] For the OrComposite.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:technical/lom:requirement/lom:orComposite">

                    <sch:assert test="count(lom:type) = 0 or count(lom:type) = 1">
                        [RULE for Local Attribute 1] Invalid number of "type" elements: <sch:value-of select="count(lom:type)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:name) = 0 or count(lom:name) = 1">
                        [RULE for Local Attribute 2] Invalid number of "name" elements: <sch:value-of select="count(lom:name)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:minimumVersion) = 0 or count(lom:minimumVersion) = 1">
                        [RULE for Local Attribute 3] Invalid number of "minimumVersion" elements: <sch:value-of select="count(lom:minimumVersion)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:maximumVersion) = 0 or count(lom:maximumVersion) = 1">
                        [RULE for Local Attribute 4] Invalid number of "maximumVersion" elements: <sch:value-of select="count(lom:maximumVersion)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Purpose.Type">
                <sch:title>[RULESET] For the Purpose.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:classification/lom:purpose">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Relation.Type">
                <sch:title>[RULESET] For the Relation.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:relation">

                    <sch:assert test="count(lom:kind) = 0 or count(lom:kind) = 1">
                        [RULE for Local Attribute 1] Invalid number of "kind" elements: <sch:value-of select="count(lom:kind)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:resource) = 0 or count(lom:resource) = 1">
                        [RULE for Local Attribute 2] Invalid number of "resource" elements: <sch:value-of select="count(lom:resource)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Requirement.Type">
                <sch:title>[RULESET] For the Requirement.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:technical/lom:requirement">

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Resource.Type">
                <sch:title>[RULESET] For the Resource.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:relation/lom:resource">

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Rights.Type">
                <sch:title>[RULESET] For the Rights.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:rights">

                    <sch:assert test="count(lom:cost) = 0 or count(lom:cost) = 1">
                        [RULE for Local Attribute 1] Invalid number of "cost" elements: <sch:value-of select="count(lom:cost)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:copyrightAndOtherRestrictions) = 0 or count(lom:copyrightAndOtherRestrictions) = 1">
                        [RULE for Local Attribute 2] Invalid number of "copyrightAndOtherRestrictions" elements: <sch:value-of select="count(lom:copyrightAndOtherRestrictions)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:description) = 0 or count(lom:description) = 1">
                        [RULE for Local Attribute 3] Invalid number of "description" elements: <sch:value-of select="count(lom:description)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="RoleLifeCycle.Type">
                <sch:title>[RULESET] For the RoleLifeCycle.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:lifeCycle/lom:contribute/lom:role">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="RoleMetaMetadata.Type">
                <sch:title>[RULESET] For the RoleMetaMetadata.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:metaMetadata/lom:contribute/lom:role">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="SemanticDensity.Type">
                <sch:title>[RULESET] For the SemanticDensity.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:educational/lom:semanticDensity">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Status.Type">
                <sch:title>[RULESET] For the Status.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:lifeCycle/lom:status">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Structure.Type">
                <sch:title>[RULESET] For the Structure.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:general/lom:structure">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Taxon.Type">
                <sch:title>[RULESET] For the Taxon.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:classification/lom:taxonPath/lom:taxon">

                    <sch:assert test="count(lom:id) = 0 or count(lom:id) = 1">
                        [RULE for Local Attribute 1] Invalid number of "id" elements: <sch:value-of select="count(lom:id)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:entry) = 0 or count(lom:entry) = 1">
                        [RULE for Local Attribute 2] Invalid number of "entry" elements: <sch:value-of select="count(lom:entry)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="TaxonPath.Type">
                <sch:title>[RULESET] For the TaxonPath.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:classification/lom:taxonPath">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Technical.Type">
                <sch:title>[RULESET] For the Technical.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:technical">

                    <sch:assert test="count(lom:size) = 0 or count(lom:size) = 1">
                        [RULE for Local Attribute 2] Invalid number of "size" elements: <sch:value-of select="count(lom:size)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:installationRemarks) = 0 or count(lom:installationRemarks) = 1">
                        [RULE for Local Attribute 5] Invalid number of "installationRemarks" elements: <sch:value-of select="count(lom:installationRemarks)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:otherPlatformRequirements) = 0 or count(lom:otherPlatformRequirements) = 1">
                        [RULE for Local Attribute 6] Invalid number of "otherPlatformRequirements" elements: <sch:value-of select="count(lom:otherPlatformRequirements)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:duration) = 0 or count(lom:duration) = 1">
                        [RULE for Local Attribute 7] Invalid number of "duration" elements: <sch:value-of select="count(lom:duration)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

            <!-- RULESET ******************************************************************* -->
            <sch:pattern abstract="false" id="Type.Type">
                <sch:title>[RULESET] For the Type.Type complexType.</sch:title>

                <sch:rule abstract="false" context="lom:lom/lom:technical/lom:requirement/lom:orComposite/lom:type">

                    <sch:assert test="count(lom:source) = 0 or count(lom:source) = 1">
                        [RULE for Local Attribute 1] Invalid number of "source" elements: <sch:value-of select="count(lom:source)"/>.
                    </sch:assert>

                    <sch:assert test="count(lom:value) = 0 or count(lom:value) = 1">
                        [RULE for Local Attribute 2] Invalid number of "value" elements: <sch:value-of select="count(lom:value)"/>.
                    </sch:assert>

                </sch:rule>

            </sch:pattern>
            <!-- *************************************************************************** -->

        </xs:appinfo>
    </xs:annotation>

    <!-- Generate Global Attributes *********************************************************************** -->

    <!-- ================================================================================================== -->

    <!-- Generate Global List Types *********************************************************************** -->

    <!-- ================================================================================================== -->

    <!-- Generate Namespaced extension Group  ************************************************************* -->

    <xs:group name="grpLax.any">
        <xs:annotation>
            <xs:documentation>
                Any namespaced element from any namespace may be included within an "any" element.
                The namespace for the imported element must be defined in the instance, and the schema must be imported.
                The extension has a definition of "lax" i.e. they can reuse elements from the target namespace.
            </xs:documentation>
        </xs:annotation>
        <xs:sequence>
            <xs:any namespace = "##other" processContents = "lax" minOccurs = "0" maxOccurs = "unbounded"/>
        </xs:sequence>
    </xs:group>

    <!-- ================================================================================================== -->

    <!-- Generate Special DataTypes  ********************************************************************** -->

    <!-- ================================================================================================== -->

    <!-- Generate the enumerated simpleType declarations ************************************************** -->

    <!-- ================================================================================================== -->

    <!-- Generate the simpleType elements based on IMS data-types (Parameter) ***************************** -->

    <!-- ================================================================================================== -->

    <!-- Generate the simpleType elements based on IMS data-types (Derived) ******************************* -->

    <!-- ================================================================================================== -->

    <!-- Generate the simpleType elements based on IMS data-types (Union) ********************************* -->

    <!-- ================================================================================================== -->

    <!-- Generate the simpleType elements based on IMS data-types (Complex) ******************************* -->

    <!-- ================================================================================================== -->

    <!-- Generate the derived data-type elements based upon simpleType ************************************ -->

    <!-- ================================================================================================== -->

    <!-- Generate the derived data-type elements based upon derived simpleType **************************** -->

    <!-- ================================================================================================== -->

    <!-- Generate the data-type ComplexTypes ************************************************************** -->

    <xs:complexType name="AggregationLevel.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The AggregationLevel complexType is the container for the information about the 
functional granularity of this learning object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
    </xs:complexType>

    <xs:complexType name="Annotation.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Annotation complexType is the container for comments on the educational use of this learning object, 
and information on when and by whom the comments were created.  This category enables educators to share their
assessements of learning objects suggestions for use, etc.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="entity" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="date" type="DateTime.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Classification.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Classification complexType is the container for information which describes where this learning 
object falls within a particular classification system.  To define multiple classifications, there may be 
multiple instances of this category.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="purpose" type="Purpose.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="taxonPath" type="TaxonPath.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="keyword" type="LangString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Context.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Context complexType is the container for the information about the principal environment within which the 
learning and use of this learning object is intended to take place.  Suggested good practice is to use one of the 
values of the value space and to use an additional instance of this data element for further refinement.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="ContributeLifeCycle.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Contribute complexType is the container for the entities (i.e. people, organizations) that have
contributed to the state of the learning object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="role" type="RoleLifeCycle.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="entity" type="CharacterString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="date" type="DateTime.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="ContributeMetaMetadata.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The ContributeMetametadata complexType is the container for the information about those entities that have affected the 
state of this metadata instance during its lifecycle e.g. creation, validation.  This information is about contributions to the metadata.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="role" type="RoleMetaMetadata.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="entity" type="CharacterString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="date" type="DateTime.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="CopyrightAndOtherRestrictions.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The CopyrightAndOtherRestrictions complexType defines whether copyright or other restrictions apply 
to the use of this learning object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Cost.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Cost complexType is the container for whether use of this learning object requires payment.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="DateTime.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The DateTime abstract complexType is the container for the annotated date/time.  An accuracy 
of at least one second is supported.  The ISO 8601 format is used.  An associated description is also provided.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="dateTime" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Difficulty.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Difficulty complexType is the container for the information about how hard it is to work with or through this 
learning object for the typical intended target audience.  The typical audience can be characterised by the data 
elements Educational.Context and Educational.TypicalAgeRange.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Duration.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Duration abstract complexType is the container for an annotated duration.  The value space 
for the duration is defined as per ISO 8601:2000.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="duration" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Educational.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Educational complexType is the container for the information that describes the key educational or
pedagogic characteristics of this learning object.  This is pedagogical informtion essential to those involved
in achieving a quality learning experience.  The audience for this metadata includes teachers, managers,
authors and learners.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="interactivityType" type="InteractivityType.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="learningResourceType" type="LearningResourceType.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="interactivityLevel" type="InteractivityLevel.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="semanticDensity" type="SemanticDensity.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="intendedEndUserRole" type="IntendedEndUserRole.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="context" type="Context.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="typicalAgeRange" type="LangString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="difficulty" type="Difficulty.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="typicalLearningTime" type="Duration.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="language" type="CharacterString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="General.Type" mixed="false">
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="identifier" type="Identifier.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="title" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="language" type="CharacterString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="keyword" type="LangString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="coverage" type="LangString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="structure" type="Structure.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="aggregationLevel" type="AggregationLevel.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Identifier.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Identifier complexType is the container for the globally unique idenitifer that identifies 
the associated parent object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="catalog" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="entry" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="IntendedEndUserRole.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The IntendedEndUserRole complexType is the container for the information about the principal user(s) for which this learning object
was designed, most dominant first.  For Strict LOM binding this has an enumerated vocabulary.  The Classification element can be used
to describe the role through the skills the user is intended to master, or the tasks he or she is intended to be able to accomplish.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="InteractivityLevel.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The InteractivityLevel complexType is the container for information about the degree of interactivity of the learning
object.  Interactiviy in this context refers to the degree to which the learner can influence the aspect or behaviour
of the learning object.  Inherently, this scale is meaningful within the context of a community of practice.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="InteractivityType.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The InteractivityType complexType is the container for the information about the predominant mode of learning
supported by this learning project.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Kind.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Kind complexType is the container for the nature of the relationship between this learning object and the
target learning object, identified by information in the associated Resource complexType.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="LangString.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The LangString complexType is the container for a group of language specific characterstrings.
            </xs:documentation>
        </xs:annotation>
        <xs:sequence>
            <xs:element name="string" type="LanguageString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
        </xs:sequence>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="LearningResourceType.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The LearningResourceType complexType is the container for the information about the specific kind of learning object.
The most dominant kind shall be first.  The vocabulary terms are defined as in OED:1989 and as used by any educational
communties of practice.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="LifeCycle.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The LifeCycle complexType is the container for the history and current state of this
learning object and those entities that have affected this learning object during its evolution.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="version" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="status" type="Status.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="contribute" type="ContributeLifeCycle.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="LOM.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The LOM complexType is the container for the metadata instance.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="general" type="General.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="lifeCycle" type="LifeCycle.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="metaMetadata" type="MetaMetadata.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="technical" type="Technical.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="educational" type="Educational.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="rights" type="Rights.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="relation" type="Relation.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="annotation" type="Annotation.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="classification" type="Classification.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="MetaMetadata.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The MetaMetadata complexType is the container for the information that describes this metadata record
itself (raher than the learning object that this record describes).  This category describes how the metadata
instance can be identified, who created this metadata instance, and how, when, and with what references.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="identifier" type="Identifier.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="contribute" type="ContributeMetaMetadata.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="metadataschema" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="language" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Name.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Name complexType is the container for the name of the required technology to use this
learning object.  The value for this element may be derived from the 'technical.format' automatically
e.g. 'video/mpeg' implies 'multi-os'.  Also, this vocabulary includes most values in common use at the
time the LOM Standard was created.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="OrComposite.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The OrComposite complexType is the container for grouping multiple requirements.  The composite requirement
is satisfied when one of the component requirements is satisfied i.e. the logical connector is 'OR'.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="type" type="Type.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="name" type="Name.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="minimumVersion" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="maximumVersion" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Purpose.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Purpose complexType is the container for the information on the purpose of
classifying this learning obect.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Relation.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Relation complexType is the container for the information that defines the relationship between this 
learning object and other learning objects, if any.  To define multiple relationships, there may be multiple 
instances of this category.  If there is more than one target learning object the each object shall have a new 
relationship instance.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="kind" type="Kind.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="resource" type="Resource.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Requirement.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Requirement complexType is the container for the information about the technical capabilities necessary for 
using this learning object.  If there are multiple requirements, then all are required i.e. the logical connector is 'AND'.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="orComposite" type="OrComposite.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Resource.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Resource complexType is the container for the information about the target learning object that this relationship references.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="identifier" type="Identifier.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Rights.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Rights complexType describes the intellectual property rights and conditions of use for this learning object.
NOTE: The intent is to reuse results of ongoing work in the Intellectual Property Rights and e-commerce
communities.  This category currently provides the absolute minimum level of detail only.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="cost" type="Cost.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="copyrightAndOtherRestrictions" type="CopyrightAndOtherRestrictions.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="description" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="RoleLifeCycle.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Role complexType is the container for the kind of contribution.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="RoleMetaMetadata.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The RoleMetaMetadata complexType is the container for the information about the kind of contribution.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="SemanticDensity.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The SemanticDensity complexType is the container for the information about the degree of conciseness of a learning object.
The semantic density of a learning object may be estimated in terms of its size, or - in the case of self-timed resources
such as audio or video - duration.  The semantic density of a learning object is independent of its difficulty.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Status.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Status complexType is the container for the completion status or the condition of this learning object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Structure.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Structure complexType is the container about the underlying organizational structure of
this learning object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Taxon.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Taxon complexType is the container for the information about a particular term within a
taxonomy.  A taxon is a node that has a defined label or term.  A taxon may also have an alphanumeric 
designation or identifier for standardized reference.  Either or both the label and the entry may be used 
to designate a particular taxon.  An ordered list of taxons creates a taxonomic path i.e. 'taxononomic 
stairway': this is a path from a more general to more specific entry in a classification.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="id" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="entry" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="TaxonPath.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The TaxonPath complexType is the container for the information about the taxonomic path in a 
specific classification system.  Each succeeding level is a refinement in the definition of the 
preceding level.  There may be different paths in the same or different classifications, which 
describe the same characteristic.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="taxon" type="Taxon.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Technical.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Technical complexType is the container for the information that describes the technical requirements and 
characteristics of this learning object.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="format" type="CharacterString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="size" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="location" type="CharacterString.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="requirement" type="Requirement.Type" minOccurs = "0" maxOccurs = "unbounded"/>
            <xs:element name="installationRemarks" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="otherPlatformRequirements" type="LangString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="duration" type="Duration.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="Type.Type" mixed="false">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The Type complexType is the container for the information about the technology required to use this 
learning object e.g. hardware, software, network, etc.
            </xs:documentation>
        </xs:annotation>
        <xs:choice minOccurs = "0" maxOccurs = "unbounded">
            <xs:element name="source" type="CharacterString.Type" default="LOMv1.0" minOccurs = "0" maxOccurs = "1"/>
            <xs:element name="value" type="CharacterString.Type" minOccurs = "0" maxOccurs = "1"/>
            <xs:group ref="grpLax.any"/>
        </xs:choice>
        <xs:anyAttribute namespace = "##other" processContents = "lax"/>
    </xs:complexType>

    <xs:complexType name="CharacterString.Type">
        <xs:annotation>
            <xs:documentation source="umldocumentation">
                The CharacterString derivedType is a String of unlimited size.
            </xs:documentation>
        </xs:annotation>
        <xs:simpleContent>
            <xs:extension base="xs:string">
                <xs:anyAttribute namespace = "##other" processContents = "lax"/>
            </xs:extension>
        </xs:simpleContent>
    </xs:complexType>

    <xs:complexType name="LanguageString.Type">
        <xs:simpleContent>
            <xs:extension base="xs:string">
                <xs:attribute name="language" use="optional" type="xs:string"/>
                <xs:anyAttribute namespace = "##other" processContents = "lax"/>
            </xs:extension>
        </xs:simpleContent>
    </xs:complexType>

    <!-- ================================================================================================== -->

    <!-- Declaration of the elements (Complex) ************************************************************ -->

    <!-- ================================================================================================== -->

    <!-- Declaration of the elements (Derived) ************************************************************* -->

    <!-- ================================================================================================== -->

    <!-- Declaration of the root element(s) *************************************************************** -->

    <xs:element name="lom" type="LOM.Type"/>

    <!-- ================================================================================================== -->

</xs:schema>
